COMMERCE BUSINESS DAILY ISSUE OF MARCH 1,1995 PSA#1293U.S. Army Engineer District, Savannah, Corps of Engineers, ATTN:
CESAS-EN-EA, P.O. Box 889, Savannah, Georgia 31402-0889 or 100 W.
Oglethorpe, Savannah, GA 31401-3640 C -- AIR NATIONAL GUARD B-1 BEDDOWN AT ROBINS AFB, GA POC DEREK CUDD
At 912/652-5688. 1. CONTRACT INFORMATION: A-E services are required for
site investigations, planning engineering studies, concept design,
final design (option). This announcement is open to all firms
regardless of size. Large business offerors that require subcontractors
must identify subcontracting opportunities with small business, woman
owned and small disadvantaged business subcontracting plan in
accordance with FAR 52.219.9 and DFARS 219.704/705 as part of the
Request for Proposal package. The following subcontractoring goals are
the minimum acceptable goals to be included in the subcontracting
plan, OF THE SUBCONTRACTED WORK, 60% to SMALL BUSINESS, 10% To SMALL
DISADVANTAGED BUSINESS (A COMPOSITE OF SMALL BUSINESS), 5% To
WOMAN-OWNED BUSINESS (A COMPOSITE OF SMALL BUSINESS). Large business
firms that intend to do subcontracting must convey their intent to meet
the minimum subcontracting goals on the SF 255, Block 6. Written
justification must be provided if the minimum goals cannot be provided.
For additional information concerning SUBCONTRACTING PLAN requirements,
contact Gwennette Miller, Small Business Specialist at 912/652-5340.
The estimated construction cost range is $10,000,000.00 to
$25,000,000.00. This will be a firm fixed price contract. The contract
is anticipated to be awarded in May 1995 and completed in April 1996.
** 2. PROJECT INFORMATION: Services to include Master Plan and design
of the following projects: FY-94, B-1 Beddown, FY-9 Consolidated
Aircraft Support and Hydrant System and FY-97, Site Improvements. The
Master Plan is to include Area Development Plan, utility study, traffic
study and cost estimate for each of two scenerios chosen. The B-1
Beddown project consist of design for: entire Beddown rough site
development, taxiway, apron, road network, parking lots, drainage,
utilities extension of the hydrant system and support for CASS system.
Consolidated Aircraft Support and hydrant systems includes design for
all utilities, pavements, tie downs, lighting and support facilities
for CASS and fuel system. The B1 Site Impovements project consists of
upgrading taxiways, road network, and parking lots. The estimates for
this project shall be prepared using the latest Version of MCACES Gold
Software. The software and User's Manual will be provided to the
successful A-E. The drawings will be prepared using graphics created
via Intergraph Microstation 32 or Micro/Station PC (4.0) and/or
AutoCADD Version 11. All drawing files delivered to the District that
have been created using AutoCADD Version 11 must be translated to .dgn
files. The Contractor shall possess the software to enable the full
translation of drawing files from .dwg and vice versa. Before final
selection the preselection A-E's may be required to demonstrate the
above compatiblity by reproducing a Government supplied standard
drawing and translating it to the Intergraph format above. The method
of translation must be thoroughly described and documented in Block 10
if the A-E does not have an Intergraph CADD System. ** 3. SELECTION
CRITERIA: The selection criteria in descending order of importance are:
a. Specialized experienced in the type of work described in Project
Information. The A-E selected will be required to submit a Design
Quality Assurance Plan concurrently with their fee proposal.
Information on what is to be contained in this plan will be furnished
upon notification of selection. Firms responding to this announcement
are requested not to transmit this plan with their SF 255. ** b. Past
performance on contracts with Government agencies and private industry
in terms of cost control, quality of work, and compliance with
performance schedules. ** c. Capacity to accomplish the design in the
required time and dedicate at least one (1) person in the following
disciplines: architectural, electrical engineer, mechanical engineer,
structural engineer, civil engineer, environmental engineering,
industrial hygienist (asbestos) and topo surveying. The design team
must include a Registered Engineer or Registered Architect who is a
full ''member'' in good standing of the Society of Fire Protection
Engineers (SFPE) or an individual who is a registered Fire Protection
Engineer and whose principle duties are Fire Protection Engineering. **
d. Professional qualifications of key management and professional staff
members. ** e. Extent of participation of SB, SDB, WOB, historically
black colleges and university and minority institutions in the proposed
contract team, measured as a percentage of the estimated effort. ** f.
Location of the firm in the general geographic area of the project. **
g. Volume of DoD ontract awards in the last 12 months as described in
Note 24. ** 4. SUBMITTAL REQUIREMENTS: Firms desiring consideration
must submit ONE (1) copy of SF 255 (revised 11/92) for prime and ONE
(1) copy of Sf 254 (revised 11/92) for prime and each consultant to the
above address by 29 March 1995 to be considered for selection. DEPTH of
PRIME and SUBCONTRACTOR PERSONNEL in EACH discipline must be shown in
Block 4 of SF 255 and SF 254 to clearly identify the nmber of personnel
in each firm and discipline. COVER letters and extraneous materials are
NOT desired and WILL NOT be considered. ** PHONE calls are DISCOURAGED
unless ABSOLUTELY necessary. Personal visits for the PURPOSE of
DISCUSSING this ANNOUNCEMENT will NOT be SCHEDULED. THIS is NOT a
REQUEST for a PROPOSAL. (0058) Loren Data Corp. http://www.ld.com (SYN# 0038 19950228\C-0012.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|