COMMERCE BUSINESS DAILY ISSUE OF MARCH 1,1995 PSA#1293Department of the Army, New England Division, Corps of Engineers, 424
Trapelo Road, Waltham, Massachusetts 02254-9149 Z -- REPAIRS TO SPILLWAY AND DOANE HILL ROAD BRIDGES, TULLY LAKE,
ATHOL, MASSACHUSETTS SOL DACW33-95-B-0054 DUE 050495 POC Jerry
Nunziato, 617-647-8424 The Spillway Bridge is a concrete arch bridge
located over the Tully Lake Dam spillway. Repairs include removing
3,000 s.f. of 3 inch thick bituminous concrete pavement from the bridge
deck and replacing it with a 9 inch thick portland cement concrete deck
slab. The work also includes miscellaneous concrete repairs and repairs
to both steel beam and cable type guardrails. The Doane Hill Road
Bridge is concrete slab over steel stringer construction. Repairs at
this bridge include removing 240 l.f. of wooden bridge rails and
replacing them with steel tube rails, 100 s.f. of concrete spall and
miscellaneous concrete repairs, and repairs of approach cable type
guard rails. Work includes, cleaning and painting the structural steel.
The original paint contains lead based primer. Estimated cost of the
work is between $100,000.00 and $250,000.00. Work shall be completed
within 120 calendar days. Plans and specifications available on or
about 033095 at a cost of $12.00 per set. All responsible sources may
submit a bid which will be considered by the New England Division.
(0058) Loren Data Corp. http://www.ld.com (SYN# 0174 19950228\Z-0024.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|