COMMERCE BUSINESS DAILY ISSUE OF MARCH 7,1995 PSA#1297U.S. Army Corps of Engineers, Fort Worth District, P.O. Box 17300, 819
Taylor Street, ATTN: CESWF-CT, Fort Worth, TX 76102-0300 C -- INDEFINITE DELIVERY CONTRACT FOR MULTIDISCIPLINE DESIGN SERVICES
FOR (PRIMARILY MECHANICAL/ELECTRICAL) PROJECTS ASSIGNED TO THE FORT
WORTH DISTRICT (PRIMARILY FORT POLK, LA) SOL DACA63-95-R-0027 POC
Sharon McLellan, (817/334-3939). 1. CONTRACT INFORMATION: The work may
involve Design, Drafting, Planning, Studies and Site Investigation
associated with this type of project. All work must be done by or under
the direct supervision of licensed professional Engineers or
Architects. The work under this contract is anticipated to begin in
September 1995 and run for twelve months with a 12 month option.
Estimated A-E Fee Including Option: $1,500,000.00 maximum ($750,000.00
basic, $750,000.00 option), with a maximum Delivery Order amount of
$150,000.00. The minimum amount to be paid under this contract is
$15,000.00. If a large business firm is selected for this announcement
it must comply with the FAR 52.219-9 clause regarding the requirement
for a subcontracting plan. The Fort Worth district's goal on work to
be subcontracted is that a minimum of 60.3% of the Contractor's total
intended subcontract amount be placed as follows: 9.8% be placed with
Small Disadvantaged Businesses (SDB), 2.9% with Women Owned Small
Business (WOB) and the remaining 47.6% be placed with Small Businesses
(SB) for a total of 60.3%. The plan is not required as part of this
submittal. The proposed services will be obtained by Negotiated Fixed
Price Contract. Projects outside the primary area of responsibility may
be added at the Governments discretion upon agreement of the selected
firm. 2. PROJECT INFORMATION: The work may involve Design, Drafting,
Planning, Studies and Site Investigations associated with an Indefinite
Delivery Contract for projects which are primarily of a Mechanical,
Electrical nature. Projects are expected to be for maintenance, repair
or alterations to existing facilities and/or small new construction.
Work may also include designs/studies for environmental or EPA
considerations. Services during a project's construction phase may also
be required. 3. SELECTION CRITERIA: See CBD Note 24 (Monday issue) for
general description of selection process. Selection criteria in
descending order of importance are as follows: (a) Professional
Capabilities: This type of Indefinite Delivery Contract will require,
at a minimum, the following: 3 Mechanical, 3 Electrical, 2 Civil, 2
Structural, Engineers and 2 Architects, Cost Estimating, Surveyors,
Environmental Design/Remediation Expertise, lab testing, and design to
Fire Protection/Life Safety codes. Required disciplines may be either
inhouse or through consultant. (b) Specific Experience and Technical
Competence: The selected team must demonstrate experience in the design
of repair, renovation or alteration of existing facilities and
infrastructures, utilities, HVAC systems, and small new construction.
Firms must show experience in evaluating contractor's submittals and
construction surveillance. Firms must have at least two year's
experience in Fire Protection/Life Safety Design and be familiar with
the use and application of NFPA codes 80 and 101 and MIL-HDBK-1008A.
Demonstrate experience in working with a testing laboratory to design
for water quality, removal of friable asbestos and remediation of
lead-based paint hazards and underground toxic substances. (c) Firms
must show adequate team capacity to design three Delivery Orders
concurrently meeting all schedules. (d) Demonstrate past performance
with respect to cost control, quality of work, and compliance with
performance schedules. (e) Geographical Location: Firms must show
familiarity with Fort Polk, LA and the surrounding area. (f)
Specifications and construction cost estimates prepared on IBM
compatible equipment. Construction cost estimates prepared using
Government PC based computer Aided Cost Estimating System (M- CACES)
(Software will be provided). Computer Media for a Computer Aided Design
and Drafting (CADD) system (Auto CADD or Intergraph compatible). (g)
Extent of participation of SB, SDB, Women-Owned Business (WOB), and
Historically Black Colleges and Universities and Minority Institutions
(HBCU) in the proposed contract team, measured as a percentage of the
estimated effort. (h) In Block 10 of the SF 255, show last 12 month's
DOD awards. 4. SUBMITTAL REQUIREMENT: (a) See Note No. 24 for general
submission requirements. Interested firms must provide one submittal
package including an original SF 254 and SF 255 no later than 4:30 p.m.
on the 30th day after the date of this announcement to be considered.
The 11/92 version of the forms must be used. If the 30th day is a
Saturday, Sunday or Federal Holiday, the deadline is 4:30 p.m. of the
next business day. (b) Responding firms must submit a current and
accurate SF 254 for themselves and each proposed consultant. It must be
provided for the specific office proposed to do the work. Indicate in
Block No. 4 of SF 254 if your firm is a Large, Small, Small and
Disadvantaged, Woman-Owned Business, or Historically Black Colleges and
Unversities or Minority Instituitons (HBCU). To be classified as a
small business, a firm's average annual receipts or sales for the
preceding three fiscal years, must not exceed $2.5 million. (c) Submit
only one SF 255, completed in accordance with the instructions. It
must contain information in sufficient detail to identify the team
(prime and consultants) proposed for the contract. (d) Include CBD
announcement number in Block NO. 2b of the SF 255. (e) In Block No. 4
of the SF 255, insert only the number of consultant personnel by
discipline proposed for potential project as (A). Insert only the
number of in-housed personnel by discipline proposed for potential
project as (B). (f) In Block NO. 6 of the SF 255, identify the
discipline/service to be supplied by each consultant, including the
number of individuals employed by each. (g) Provide brief resumes of
the on-staff or consultant employees you intend to use to perform the
work in the anticipated design time and the project assignment they
will perform in Block No. 7 of your SF 255. Block No. 7 should be
repeated, as needed, to identify all the major disciplines and team
members. Selection will be based on the total team members presented in
your SF 255, primarily block No. 7. (h) Solicitation packages are not
provided for A-E contracts. This is not a request for proposal (see
Note No. 24). (0062) Loren Data Corp. http://www.ld.com (SYN# 0029 19950306\C-0005.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|