Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MARCH 8,1995 PSA#1298

USDI, Bureau of Reclamation, Attention: UC-841, 125 South State Street, Room 6107, Salt Lake City, Utah, 84138-1102

Y -- SYAR TUNNEL GROUTING, DIAMOND FORK POWER SYSTEM, BONNEVILLE UNIT, CENTRAL UTAH PROJECT, UTAH SOL 1425-5-SI-40-17540 DUE 050495 POC Contact Bill Hermann, (801) 524-5359, Contract Specialist, or Mike C. Ward, (801) 524-5248, Contracting Officer The work is situated in Utah and Wasatch Counties approximately 40 miles east of Spanish Fork, Utah. The principal components of the work to be performed under these specifications include the following: 1. Drilling holes through the Syar Tunnel concrete lining and pressure grouting the tunnel will be required in the following reaches: From Sta. 97+64 to Sta. 155+00 and from Sta. 330+00 to Sta. 375+50. 2. Drilling and pressure grouting may be required in the following reaches, depending on the results of grouting the first two reaches: From Sta. 230+00 to Sta. 330+00; and from Sta. 155+00 to Sta. 230+00. 3. Drilling and pressure grouting of approximately 25 seepage locations throughout the tunnel. FIRST COPY OF SOLICITATION IS FREE, ANY ADDITIONAL COPIES ARE $5 EACH. ONLY REQUESTS IN WRITING WILL BE ACCEPTED FOR SOLICITATIONS. Send requests to the Bureau of Reclamation, Attention: UC-848, 125 South State Street, Room 6107, Salt Lake City, Utah 84138-1102. The price range is $1,000,001 million to $5 million. Technical questions and site visit information, should be directed to the Provo Area Office, Provo, Utah, at (801) 379-1000. (0065)

Loren Data Corp. http://www.ld.com (SYN# 0152 19950307\Y-0003.SOL)


Y - Construction of Structures and Facilities Index Page