COMMERCE BUSINESS DAILY ISSUE OF MARCH 10,1995 PSA#1300Commanding Officer, Southwest Division, Naval Facilities Engineering
Command, Code 0211, 1220 Pacific Highway, Room 145, San Diego, CA
92132-5187 C -- A-E SERVICES FOR STRUCTURAL REPAIRS/CONSTRUCTION AND MAINTENANCE
DREDGING AT THE FUELING PIER, FLEET AND INDUSTRIAL SUPPLY CENTER,
POINT LOMA, SAN DIEGO, CALIFORNIA SOL N68711-95-C-7595 DUE 041495 POC
Anne Garrett/Contract Specialist, (619) 532-3708, Nancy J.
Trent/Contracting Officer, (619) 532-2853. Firm Fixed-Price.
Architect-Engineer services are required to perform engineering studies
and designs for the following three projects in the vicinity of the
fueling pier at the Fleet and Industrial Supply Center, Point Loma,
California: (1) Pier 180 Structural Repairs - various underwater and
above water structural repairs to the pier and adjacent concrete
quaywall, including repairs to steel caissons, concrete piles, concrete
sheet piles, mooring dolphins, pier underdeck and supporting structure,
and new sheet pile bulkhead, (2) Maintenance Dredging of Pier 180 -
maintenance dredging at the inboard and outboard approaches to the
fueling pier, (3) Oil Skimmer Launch Facility - construct a crane and
rail assembly with ramps to allow for the rapid deployment of a
self-propelled oil skimmer barge to be used for limiting the damage
from accidental oil or fuel discharges to the surface of the water in
the vicinity of the fueling pier. The estimated construction cost is
between $1,000,000 and $5,000,000. A-E selection criteria will include
(in order of importance): (1) Recent specialized experience of the
firm (including consultants) in the design for underwater and above
water structural repair and construction of waterfront structures such
as piers, wharves, and bulkheads, and in the design of dredging, and
including experience in the application of Federal, State, and San
Diego County environmental regulations to waterfront construction and
dredging. Do not list more than a total of 10 projects in block 8.
Indicate which consultants from the proposed team, if any, participated
in the design of each project listed. (2) Professional qualifications
of the staff to be assigned to this project in the design for
underwater and above water structural repair and construction of
waterfront structures such as piers, wharves, and bulkheads, and in the
design of dredging, and including experience in the application of
Federal, State, and San Diego County environmental regulations to
waterfront construction and dredging. List only the team members who
actually will perform major tasks under this projects, qualifications
should reflect the individuals' potential contributions to this
project. (3) Past performance on contracts with government agencies and
private industry in terms of cost control, quality of work and
compliance with performance schedules. Indicate by briefly describing
internal quality assurance and cost control procedures and indicate
team members who are responsible for monitoring these processes. List
recent awards, commendations and other performance evaluations (do not
submit copies). (4) Location in the general geographic area of the
project and knowledge of the locality of the project, provided that the
application of this criterion leaves an appropriate number of firms
given the nature and size of this project. (5) Capacity to accomplish
the work in the required time. Indicate the firms present workload and
the availability of the project team (including consultants) for the
specified contract performance period and indicate specialized
equipment available and prior security clearances. (6) List the small
or disadvantaged or woman-owned business firms used as primary
consultants or as subconsultants. If a large business concern is
selected for this contract, they will be required to submit a
subcontracting plan that should reflect a minimum 5% Small
Disadvantaged Business of the amount to be subcontracted out. Those
firms which meet the requirements described in this announcement and
wish to be considered, must submit one copy each of a SF 254 and a SF
255 for the firm and a SF 254 for each consultant listed in block 6 of
the firms SF 255. One copy of the submittal package is to be received
in this office no later than 3:00 P.M. Pacific Time on the due date
indicated above. Should the due date fall on a weekend or holiday, the
submittal package will be due the first workday there after.
Submittals received after this date and time will not be considered.
Additional information requested of applying firms: indicate
solicitation number in block 2b, CEC (Contractor Establishment Code)
and/or Duns number (for the address listed in block 3) and TIN number
in block 3, telefax number (if any) in block 3a and discuss why the
firm is especially qualified based on the selection criteria in block
10 of the SF 255. For firms applying with multiple offices, indicate
the office which completed each of the projects listed in block 8 and
list which office is under contract for any contracts listed in block
9. Use block 10 of the SF 255 to provide any additional information
desired. Personal interviews may not be scheduled prior to selection of
the most highly qualified firm. SF 255's shall not exceed 30 printed
pages (double sided is two pages/organizational charts and photographs
excluded, exception: photographs with text will be considered as a
page). All information must be included on the SF 255 (cover letter,
other attachments and pages in excess of the 30 page limit will not be
included in the evaluation process). Firms not providing the requested
information in the format (i.e. listing more than a total of 10
projects in block 8, not providing a brief description of the quality
control plan, not listing which office of multiple office firms
completed projects listed in block 8, etc.) directed by this synopsis
may be negatively evaluated under selection criteria (3). Firms which
design or prepare specifications for a construction contract or
procurement of supplies cannot provide the construction or supplies.
This limitation also applies to subsidiaries and affiliates of the
firm. This is not a request for proposal. Telegraphic and facsimile SF
255's will not be accepted. Site visits will not be arranged during
the submittal period. See Numbered Note(s): 24. (0067) Loren Data Corp. http://www.ld.com (SYN# 0029 19950309\C-0010.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|