|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 13,1995 PSA#1301USDI, Bureau of Reclamation, Attention: UC-841, 125 South State Street,
Room 6107, Salt Lake City, Utah, 84138-1102 Y -- CROPSY PHASE 3 - REMEDIAL ACTION, SUMMITVILLE MINE SUPERFUND
SITE, COLORADO SOL 1425-5-SI-40-17580 DUE 051895 POC Contact Bill
Hermann, (801) 524-5359, Contract Specialist, or Mike C. Ward, (801)
524-5248, Contracting Officer The work is located approximately 25
miles southwest of Del Norte, Colorado, and involves the remediation of
an EPA Superfund site resulting from a gold mining operation. The job
site is in excess of 11,500 feet elevation. The work involves placing
topsoil and revegetating the Cropsy waste pile footprint; excavating,
transporting and placing the Beaver Mud Dump material; placing topsoil
and revegetating the Beaver Mud Dump footprint; excavating,
transporting and placing the Clay Fines stockpile material; excavating
the Iowa adit; regrading the south and north mine pits with an
impermeable cap and place topsoil and revegetate; and site collection
and drainage features for overall sitewide storm water management.
Solicitations will be available after April 3, 1995. THERE WILL BE A
CHARGE OF $12.00 FOR EACH COPY OF THE SOLICITATION. ONLY REQUESTS IN
WRITING WILL BE ACCEPTED FOR SOLICITATIONS. Send requests to the Bureau
of Reclamation, Attention: UC-848, 125 South State Street, Room 6107,
Salt Lake City, Utah 84138-1102 or by faxogram at (801) 524-5499. The
price range is $10 million to $25 million. There will be a Pre-Bid
Conference April 18-19, 1995, at the job-site. Technical questions
concerning the work, and Pre-Bid Conference information, should be
directed to Mr. Brent Rhees, Provo Projects Office, Provo, Utah, at
(801) 379-1210. (0068) Loren Data Corp. http://www.ld.com (SYN# 0138 19950310\Y-0008.SOL)
Y - Construction of Structures and Facilities Index Page
|
|