Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MARCH 21,1995 PSA#1307

Department of VA Medical Center, Contracting Officer (90C), 4100 West Third Street, Dayton, OH 45428

C -- BOILER PLANT ASBESTOS ABATEMENT, BUILDING 147 SOL 552-95-208 DUE 050495 POC Contracting Officer, J. A. Harrison, (513)267-3994, Additional Contact, Nancy J. Allen, (513)267-3993 Furnish all necessary labor, material, tools, and equipment for Boiler Plant Asbestos Abatement at the VA Medical Center, Dayton, Ohio. Work will involve the removal and disposal of all asbestos containing material (ACM) insulation, along with non-ACM insulation, from within the boiler plant (Building 147) and from piping at the adjacent fuel oil tank farm, along with re-insulation of all piping, ductwork, tanks, etc., with the boiler plant where removed or otherwise indicated. Also included is painting and identification lettering of re-insulated service lines. Completion time: 140 days. Construction cost range $250,000 to $500,000. The Standard Industrial Classification (SIC) Code is 1799. Solicitation is unrestricted. Issue date 040495. Request for solicitations must be on the firm's letterhead requesting 552-95-208. No telephone request will be accepted. (0076)

Loren Data Corp. http://www.ld.com (SYN# 0018 19950320\C-0006.SOL)


C - Architect and Engineering Services - Construction Index Page