COMMERCE BUSINESS DAILY ISSUE OF MARCH 24,1995 PSA#1310Anniston Army Depot, Directorate of Contracting, Anniston AL
36201-4199 Z -- CHROME LINE VENTILATION REPAIR SOL DAAC01-95-R-0015 DUE 051695
POC Contract Specialist, Norma H. Gunnels, (205)235-4192, Contracting
Officer, Kathy C. Harvey, (205)235-7558 Work consists of furnishing all
plant, labor, materials, and equipment, and performing all work in
strict accordance with specifications, schedules, and Drawing No.
FE-372-94 to be furnished with the solicitation. Work is for Chrome
Lines #1 and #2 Ventilation Systems, installation/repair/upgrade.
Chrome Line #2 shall be complete and running before work commences on
Chrome Line #1. Work includes removal of all fire damaged components of
an existing Chrome Line #2 ventilation system to include FRP ductwork,
demister, FRP fan, piping, electrical components; excavating area
around both Chrome Lines #1 and #2 exhaust ductwork that is presently
underground; constructing two concrete pits; installing new PVC exhaust
ductwork, demister, fan, plumbing, and all associated components on
both Chrome Lines #1 and #2; removing one chrome plating vat and
installing two chrome plating vats to include installing 2 rectifiers,
ventilation, steam heated coils, etc. on Chrome Line #2; performing
all necessary electrical work to support system; installing all
plumbing associated with demisters; installing recycling system to
include holding tanks, pumps, meters, reverse osmosis unit, and all
associated plumbing as required to recycle demisters washdown water.
Contractor shall run PVC pipe to each chrome plating vat on both Chrome
Lines #1 and #2 to allow addition of make-up solution to vats as
needed. Emissions from equipment shall meet both Clean Air Act 40 CFR
63 Subpart N, and California Air Pollution Control Regulations, Title
17. A list of other required publications follows: ASTM D1556-82,
D1557-78, D2167-84, D2216-80, D2487-85, D2922-81, D2937-83, D3017-78,
D4318-84; Fed. Spec. SS-S-1401B, and CCC-C-467C; NBS PS 1-74 and PS
58-73; ACI 211.1-81, 211.2-81, 301-84, 315-74, and 318-83; AISI
Cold-Formed Steel Design Manual, Sep. 1980; ASTM A 185-79, A525-80a, A
615-79, A 616-79, A 617-79, C 31-87A, C 33-86, C 39-86, C 42-84a, C
78-84, C 94-86b, C 143-78, C 150-86, C 171-69, C 172-82, C 192-81, C
231-82, C 260-86, C 309-81, C 494-86, C 595-85, C 618-85, D 98-87, D
1751-73, D 1752-67, and E96-80; AWS D1.4-79; NRMCA Certification of
Ready-Mixed Concrete Production Fac (Jan 76); TMMB Truck Mixer and
Agitator Standards (Jan. 1, 1981); AMCA 99-72 and 210-74; American
Conference of Gov Industrial Hygienists 13th Ed.; ASTM A120, A167,
E84-76a, C582, D883, C581, D638, D790, D2583; Fed. Spec. WW-V-51E, and
WW-V-54D; AABC National Standard for Field Measurements and
Instrumentation; NEB Standards for Testing, Balancing, Adjusting of
Environmental Systems; NFPA 91-1973; Fed. Std. 141-A; SSPR SP-6-63;
SMACNA Publications; Fed. Spec. J-C-30A, L-C-530B, L-P-1035A, L-T-0075,
L-5-1512A, W-C-582, W-C-586B, W-F-406B, W-F-408C, W-F-1814, W-J-800C,
W-S-610c and Amn-1; W-S-865c and Int. am-2; CC-M-1807, HH-I-510d,
HH-I-553c, HH-I-595c, WW-C-00540C, WW-C-563A, WW-C-566C, and WW-C-581D;
Mil. Spec MIL-P-15147C; ANSI C97.1-1972; NEMA FU 1-1966, ICS-1970, and
RN-1974; NFPA 70-1993; UL 50 and UL 508; Fed Spec TT-E-489G,
TT-E-1593B and TT-P-38D. One Job to be performed at the Anniston Army
Depot, Anniston, Alabama 36201, Building 114. Completion time to be
within 240 calendar days after date of notice to proceed. All
responsible sources may submit an offer which shall be considered.
Requests for solicitation must be in writing and are acceptable by FAX
at 205/235-6353. Telephone requests will not be acknowledged.(0081) Loren Data Corp. http://www.ld.com (SYN# 0110 19950323\Z-0001.SOL)