COMMERCE BUSINESS DAILY ISSUE OF march 27,1995 PSA#1311U.S. Army Engineer District, Alaska, ATTN: CENPA-EN, P.O. Box 898,
Anchorage, AK 99506-0898 (Physical Address: Bluff & Plum Streets,
Building 21-700 (Rm 250), Elmendorf AFB, AK 99506-0898) C -- INDEFINITE DELIVERY ARCHITECT-ENGINEER SERVICES CONTRACT FOR
HYDROGRAPHIC SURVEY AND RELATED SERVICES, VARIOUS LOCATIONS, ALASKA SOL
DACW85-95-R-0021 POC Administrative Inquiries: Ms. Michelle Mandel,
907/753-5633 or Technical Inquiries: Mr. B.J. Adams, 907/753-2757,
Contracting Officer: Ms. Gail West 1. CONTRACT INFORMATION: This
announcement is open to all businesses regardless of size. All
responders are advised that this project may be canceled or revised at
any time during the solicitation, selection, evaluation, negotiation
and final award. The contract shall be an indefinite delivery firm
fixed price. The limit for each delivery order shall be $150,000.00
with a contract limit of $750,000.00 for a 1 year period. The contract
may include an option for an additional year and an additional
$750,000.00. More than one AE firm may be selected. Contract(s) award
is anticipated for Aug. 95. If a large business is selected for this
contract, it must comply with FAR 52.219-9 regarding the requirement
for a subcontracting plan ON THAT PART OF THE WORK IT INTENDS TO
SUBCONTRACT. The Alaska District goals are that 60.3% of the work be
subcontracted to small businesses with 9.8% of that to small
disadvantaged businesses. THE PLAN IS NOT REQUIRED WITH THIS SUBMITTAL.
Responding firms must address each discipline, clearly indicate which
shall be subcontracted, and provide a separate SF254 and SF255 for each
subcontractor necessary. The contractor shall employ, for the purpose
of performing that portion of the contract work in the State of Alaska,
individuals who are residents of the State, and who, in the case of any
craft or trade, possess or would be able to acquire promptly the
necessary skills to perform the contract. 2. PROJECT INFORMATION: The
AE selected would be required to have sufficient staff, flexibility,
and capability to be available on an as-needed basis. Typical types of
services to be provided are hydrographic project surveys for harbors
and channels. The firm must demonstrate ability to provide CAD
formatted drawings, compatible with Alaska District CAD system (AutoCAD
Version 12), for all projects. LOCATION: Various Locations, Alaska. 3.
SELECTION CRITERIA: The following selection criteria headings are
listed in descending order of importance (weighted equally): (a)
professional personnel in the following disciplines: minimum in-house
requirements are two surveyors who possess a current land surveyor's
license with the State of Alaska and are certified by the American
Congress on Surveying and Mapping (ACSM) as an ''Inshore Certified
Hydrographic Surveyor'' (b) specialized experience and technical
competence in: (1) The AE must have 5 years surveying experience with
at least 3 years of specialized experience in hydrographic surveying of
navigable harbors and channels. (2) The AE must have available
in-house: knowledge of modern electronic horizontal positioning systems
including Global Positioning System (GPS); capability of providing
sub-meter accuracy in dynamic mode and depth finding equipment
utilizing modern surveying software; experienced staff available for
operation of a vessel during survey operations; and electronic
positioning and depth finding system. (c) capacity to maintain
schedules and accomplish required work on two simultaneous delivery
orders (d) location of the firm in general geographical area of the
projects and knowledge of locality: availability of AE staff to meet
frequently with Corps personnel in the Alaska District Corps of
Engineers' office in Anchorage and ability to mobilize staff to Alaskan
project sites on relatively short notice; (e) past performance on DOD
and other contracts with respect to cost control, quality of work, and
compliance with schedules; (f) volume of DOD contract awards in the
last 12 months as described in Note 24; and (g) extent of participation
of SB, SDB, historically black colleges and universities, and minority
institutions in the proposed contract team, measured as a percentage
of the estimated effort. 4. SUBMISSION REQUIREMENTS: Firms submitting
SF 254s and 255s (1 copy only) should include: (1) organization of
proposed project team, (2) responsibilities and authority of key
project personnel, (3) relationship of project team to overall
organization of the firm, (4) a quality control plan, and (5) in block
8c of the SF 255 include a POC and phone number. Submittals must be
received at the address indicated above not later than COB (4:00 p.m.
Alaska time) on the 30th day from the date of this announcement. If the
30th day is a Saturday, Sunday, or Federal holiday, the deadline is the
close of business of the next business day. No additional information
shall be provided, and no faxed submittals shall be accepted. This is
not a request for proposal. (0082) Loren Data Corp. http://www.ld.com (SYN# 0022 19950324\C-0012.SOL)