|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 30,1995 PSA#1314Engineering Field Activity, Mediterranean, PSC 810, P.O. Box 51, AE
09619-0051 C -- ARCHITECTURAL-ENGINEERING AND ENVIRONMENTAL SERVICES FOR EUROPE,
NORTH AFRICA, AND THE PERSIAN GULF SOL N33191-95-R-4003 POC Contact
Karen J. Donald, Contract Specialist, 39-81-509-7550/ Mr. William S.
Barker, Contracting Officer, 39-81-509-7550 The CBD Notice PSA 1291 of
February 27, 1995 for Architectural/Engineering and Environmental
Services is hereby clarified, revised and/or deleted as a result of
questions received as follows: (a) The majority of the work on this
contract will beconducted in Italy, Spain, Greece, and the U.K. As
pertains to ''host nation'' statutes, regulations, codes,and criteria,
selection criteria (2) will be based on these 4 countries. In special
cases the contractor may be required to provide support inother
countries within the area of responsibility for EFA med. The contract
services area includes Europe, North Africa, and the Persian Gulf; (b)
The preparation of Environmental project documentation will consist of
(1) Navy Project Submittals(appropriate form for either Special
Projects or MILCON's in accordance with NAVFACENGCOM Instructions.; (2)
Environmental Impact Documentation (Review of Environmental Impact of
Planned Projects in accordance with CINCUSNAVEUR Instructions); (c)
Therequirement is not subject to Section III of the General Provision
on the annual U.S. MILCOM Appropriations Bill requires that this
contract can only be awarded to a U.S. Firm or a U.S. Firm in joint
venture with a host country firm; (d) The date of 30March 1995 for
receipt of SF254/255 is hereby deleted (See paragraph (h) below; (e)
Reference Evaluation Factor 7: Delete the following sentence ''DO NOT
PROVIDE THIS INFORMATION SINCE THE GOVERNMENT HAS THE DATA); (f)
Reference Block 9 of SF255:Provide all DoD fees awarded in the past 2
years active and/or closed as required by the synopsis (Note: this will
be reviewed as part of evaluation criteria (4)); (g) Reference the
requirements for specifically addressing all criteria elementslisted:
Delete the reference to ''except for element (6)'' to read ''except for
element (7)''; (h) The effective date for receipt of any revisions to
SF254/SF255 is '' 15 days from the date this announcement appears in
the CBD''; and (i) Late responses willbe handled in accordance with FAR
52.215-36 vice 52.215-10. (0087) Loren Data Corp. http://www.ld.com (SYN# 0026 19950329\C-0007.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|