|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 30,1995 PSA#1314U. S. Army Engineer District, Savannah, ATTN: CESAS-EN-EA, P.O. Box 889
(31402-0889) or 100 W. Oglethorpe (31401-3640), Savannah, Georgia C -- B-1 HANGAR COMPLEX, ROBINS AFB, GA POC DEREK CUDD AT
912/652-5688. 1. CONTRACT INFORMATION: The Savannah District, U.S. Army
Corps of Engineers, requires the services of an Architect-Engineer firm
for site investigation, planning, engineering studies, concept,
preliminary design (option), final design (option), services during
construction (option) and shop drawing review (option). This will be a
firm fixed price contract. The contract is anticipated to be awarded
in June 1995 and completed in February 1996. The estimated construction
cost range is $5,000,000.00 to $10,000,000.00. This announcement is
open to all firms regardless of size. ** 2. PROJECT INFORMATION: Design
of B-1 Hangar Complex. The facility provides engine maintenance and
storage, aircraft maintenance management, survival equipment shop, and
general aircraft maintenance. Proposed construction includes
reinforced concrete foundations and floor slab, structural steel with
masonry partitions and roof structure, mechanical ventilation system,
drainage with oil-water separator, fire suppression, equipment storage
and all other necessary utilities and support. ** 3. SELECTION
CRITERIA: See Note 24 for general process. The selection criteria in
descending order of importance are: ** a. Specialized experience in the
type of work described in Project Information. The drawings will be
prepared using graphics created via Intergraph Microstation 32 or
Micro/Station PC (4.0) and/or AutoCADD Version 11. All drawings
delivered to the District that have been created using AutoCADD Version
11 must be translated to .dgn files. The Contractor shall possess the
software to enable the full translation of drawing files from .dwg to
.dgn and vice versa. Before final selection the preselection A-E's may
be required to demonstrate the above compatibility by reproducing a
Government supplied standard drawing and translating it to the
Intergraph format above. The method of translation must be thoroughly
described and documented in Block 10 if the A-E does not have a
Intergraph CADD System. The A-E selected will be required to submit a
Design Quality Assurance Plan concurrently with their fee proposal. The
information to be contained in this plan will be furnished upon
notification of selection. Firms responding to this announcement are
requested not to transmit this plan with their SF 255. This project
must be designed using SI Metric design requirement. Design drawings
and design analysis will be in hard metric. Automated Review Management
System (ARMS) software will be used in review process. The A-E will be
required to have a modem or ftp internet access to communicate with
ARMS Central for file transfer. The software and necessary training
will be provided by the Corps at no charge. This project will require
the use of National Institute of Building Sciences Construction
Criteria Base (CCB) CD-ROM disks for the latest guide specifications
and specification editing software, SPECSINTACT. Architect-Engineer
firms will be required to have a current subscription to CCB and a
CD-ROM reader. ** b. Past performance on DoD and other contracts with
respect to cost control, quality of work, and compliance with
performance schedules. ** c. Capacity to provide staff in the following
disciplines: architect, civil engineer, structural engineer, electrical
engineer, mechanical engineer, and topographic survey crew. The design
team must include a Registered Engineer or Registered Architect who is
a full ''member'' in good standing of the Society of Fire Protection
Engineers (SFPE) or an individual who is a registered Fire Protection
Engineer and whose principal duties are Fire Protection Engineering. **
d. Professional qualifications of key management and professional staff
members. ** e. Extent of participation of SB, SDB, WOB, historically
black colleges and university and minority institutions in the proposed
contract team, measured as a percentage of the estimated effort. ** f.
Geographic location will not be a consideration in this selection. **
g. Volume of DoD contract awards in the last 12 months as described in
Note 24. ** 4. SUBMITTAL REQUIREMENTS: Firms desiring consideration
must submit ONE (1) copy of SF 255 (revised 11/92) for prime and ONE
(1) copy of SF 254 (revised 11/92) for prime and each consultant to the
above address by 02 May 1995 to be considered for selection. DEPTH of
Prime and SUBCONTRACTOR personnel in EACH discipline must be shown in
Block 4 of SF 255 and SF 254 to clearly identify the number of
personnel in each firm and discipline. COVER letters and extraneous
materials are NOT desired and WILL NOT be considered. ** PHONE calls
are DISCOURAGED unless absolutely necessary. Personal visits for the
PURPOSE of DISCUSSING this ANNOUNCEMENT will not be SCHEDULED. THIS is
NOT a REQUEST for a PROPOSAL. (0087) Loren Data Corp. http://www.ld.com (SYN# 0030 19950329\C-0011.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|