COMMERCE BUSINESS DAILY ISSUE OF MARCH 30,1995 PSA#1314Department of the Army, New England Division, Corps of Engineers, 424
Trapelo Road, Waltham, Massachusetts 02254-9149 Z -- REPAIR AND PAINT SPILLWAY BRIDGE, TOWNSHEND LAKE, JAMAICA,
VERMONT SOL DACW33-95-B-0059 DUE 053195 POC Jerry Nunziato,
617-647-8424 Work consists of removing concrete approach slabs, and
casting in place new concrete approach slabs to the spillway bridge
townshend lake. Work also consists of miscellaneous concrete repairs,
repairs to steel beam guardrails, replacement of rusted bearing nuts
and bolts, and cleaning and painting of the bridge steel. Note: The
original primer is lead-based. This is not a lead abatement, however
spot blasting of deteriorated paint is required and the work involves
a lead hazard. Estimated cost of the work is between $25,000.00 and
$100,000.00. Work shall be completed within 120 calendar days. Plans
and specifications available on or about 042795 at a cost of $12.00 per
set. All responsible sources may submit a bid which will be considered
by the New England Division. (0087) Loren Data Corp. http://www.ld.com (SYN# 0229 19950329\Z-0048.SOL)