|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 31,1995 PSA#1315Princeton University Plasma Physics Laboratory, James Forrestal Campus,
P.O. Box CN-17, Princeton, NJ 08543 J -- MAINTNENACE AND OPERATION SUPPORT OF THE TOKAMAK FUSION TEST
REACTOR (TFTR) NEUTRAL BEAM HEATING SYSTEMS SOL 95-074K DUE 060995 POC
Michael Karl, (609) 243-2076, Subcontract Administrator J --
MAINTENANCE AND OPERATION SUPPORT OF THE TOKAMAK FUSION TEST REACTOR
(TFTR) NEUTRAL BEAM HEATING SYSTEMS. The Princeton University Plasma
Physics Laboratory (PPPL) seeks interested and qualified small
businesses (SBs) capable of providing technically experienced manpower
for the maintenance, operation, and safe shutdown and removal of the
TFTR Neutral Beam Heating System and all related subsystems. The
applicable SIC is 8711, Engineering Services, Other Engineering
Services, and the applicable size standard is $2.5M. Specifically, PPPL
requires up to twenty-one (21) highly skilled technicians and lead
persons to operate the twelve (12) ion sources and the 1070W helium
refrigerator on TFTR. The types of technicians required are as follows:
Mechanical Technician, Electrical Technician III, Ion Source/Helium
Refrigerator Operator and Leadperson. The estimated period of
performance is October 1, 1995 through September 30, 1996, with two (2)
one-year options. Specific requirements are set forth in RFP No.
95-074K. The anticipated release date for the solicitation package is
April 28, 1995. Subcontract award is to take place in June, 1995,
subject to the availability of funds. This notice is not a solicitation
of offers. Requests for a copy of the solicitation package should be
submitted to Michael Karl, Subcontract Administrator. Only written
requests will be honored and may be faxed to (609) 243-2021.(0088) Loren Data Corp. http://www.ld.com (SYN# 0077 19950330\J-0034.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|