COMMERCE BUSINESS DAILY ISSUE OF APRIL 7,1995 PSA#1320Supplies Division, Second District Port Construction, Bureau, Ministry
of Transport, 5-57 Kita-Nakadori, Naka-Ku, Yokohama- Shi 231, Japan 99 -- JAPAN: POC Tel 81/45/211-7413 FAX N/A S16 Construction product
data a Industry sector code: B detailed product description:
Construction Title: phase-three manufacture of the main structure of
East breakwater at hitachinaka Port; site: at caisson yard, hitachinaka
Port, ajigaura, hitachinaka-Shi, ibaraki-ken; summary: main structure
work: manufacture of two caissons for zone one and two caissons for
zone four, of 29.85 meters length, 21.95 (24.95) meters breadth, and
22.00 meters height; one set of caisson foundation work; Construction
period: approx. 8 months; main materials to be used: approx. 12,000
cubic meters of concrete, approx. 1,760,000 kilograms of reinforcing
steel. C product specifications/technical data: N/a D quantity: N/a e
U.S. dollar value: N/a F other Information: N/a response data a
response language: Japanese B best way to respond: letter C from
manufacturers only: N/a D Information desired from U.S. firm: N/a e
primary buying factor: N/a F other Information: pre-screening required
to be eligible for bidding. Pre-screening deadline: 16:00 pm, apr. 14,
1995. Bid documents must be obtained directly from the submitting
Agency, not from U.S. Embassy. Payment in yen. A issuing Agency: Second
District Port Construction Bureau, Ministry of Transport B financing
Agency: N/a C price of bid documents: N/a D purchase bid documents by:
May 9, 1995. E tender number required in all communications: N/a F
performance bonds required: not required. G closed Procurement
procedure: N/a H bidding procedures: open competitive tendering. I bid
deadline: 14:15 pm, May 18, 1995. J other Information: ''kensetsu
kogyo shimbun'': 4/4/95. Eligible tender participants: 1) firms that do
not fall under articles 70 and 71 of the cabinet order concerning
Budget, auditing, and Accounting; 2) firms pre-qualified for open
competitive tendering on Port Construction works by the Second District
Port Construction Bureau; 3) firms that score at least 1,300 points in
Port Construction works in a formula calculated from bidding company's
objective criteria at the time of application for qualification; 4)
firms that have -- since 1990 as the main contractor -- actually
manufactured a caisson of at least 4,500 tons weight and 80 centimeters
breadth; 5) firms that can assign to the Construction site a full-time
chief engineer or engineering supervisor who meets the following
criteria: a) is qualified as a certified first-class Construction
supervisor; B) has since 1989 had experience with a Project as
described in item (4) above as chief engineer or engineering
supervisor; and C) in the case of engineering supervisor, is qualified
to supervise designated Construction works; 6) firms not related by
capital or personnel to the contractors involved in this Project; 7)
firms not currently suspended from designation by the Director of the
Second District Port Construction Bureau. This Project is open only to
designated consortia as separately announced; and 8) firms not
undergoing bankruptcy procedures. Post remarks Post contact/prepared by
haomori approved by gtaevs Please send a copy of your response to:
Commercial Officer (FCS TOP), American Embassy, Tokyo, Unit 45004, APO
Ap 96337, Refer to TC336.. (0095) Loren Data Corp. http://www.ld.com (SYN# 0392 19950406\99-0002.SOL)