COMMERCE BUSINESS DAILY ISSUE OF APRIL 7,1995 PSA#1320DA, CE, Vicksburg District, 2101 N Frontage Rd, Vicksburg MS
39180-5191 Y -- FC MR&T, YAZOO HEADWATER PROJECT, YAZOO RIVER, LEFLORE COUNTY,
MS, ALLIGATOR-CATFISH BAYOU, WATER CONTROL STRUCTURE Sol
DACW38-95-B-0048. Due 052395. POC Contract Specialist, Carla Koestler,
(601) 631-7903. The work consists of furnishing all plant, labor,
materials, and equipment and constructing the Alligator-Catfish Bayou
Water Control Structure which includes clearing and grubbing,
excavation, embankment construction, water control structure, sheet
piling, concrete, dewatering, turfing, gravel surfacing, riprap,
structural steel, reinforcing steel, roller gates and hoist, bulkhead
and hoist, staff gages, electrical work, environmental protection and
all other appurtenant work to complete the project. The estimated value
of the work is between $5,000,000 and $10,000,000. Issue date on or
about 19 Apr 95. Bid opening date on or about 23 May 95. (094) Loren Data Corp. http://www.ld.com (SYN# 0129 19950406\Y-0013.SOL)