COMMERCE BUSINESS DAILY ISSUE OF APRIL 10,1995 PSA#1321Contract Administration Section, Procurement and Right-of-Way
Department, Nagoya Construction Bureau, Japan Highway Public
Corporation, 4-1-1 Sakae, Naka-Ku, Nagoya-Shi 460, Japan 99 -- JAPAN: POC Tel 81/52/262-7084 FAX N/A S16 Construction product
data a industry sector code: B detailed product description:
Construction Title: Construction of the washimi Section on the
tokai-hokuriku expressway; site: oaza-owashi, takasu-mura, gujyo-gun,
gifu-ken; summary: this project involves Construction of a tentatively
two-lane Highway of 1,941 meters length (earth work volume 404,000
cubic meters), including bridge substructure work (at five site, 798
meters) and tunneling (at one site, 235 meters); total length: 1,941
meters; width: Highway portion 13.0 meters, bridge portion 10. 5
meters, tunnel portion 9.5 meters; earth work volume: 404,000 cubic
meters; tunneling at one site: 235 meters; bridge, etc.: Substructure
work only at five sites for 798 meters, eight sets of abutments, 10
sets of piers; foundation work: caisson-type piles of 2.5 meters
diameter and 131.5 meters length, 3.5 meters diameter and 91.0 meters
length, 8.5 meters diameter and 31.5 meters length, 13.0 meters
diameter and 37.0 meters length, 15. 0 meters diameter and 10.0 meters
length; cross structures: arch-culvert boxes at one site, culvert
pipes at one site; main materials to be used: 35,000 cubic meters of
concrete, 3,400 tons of reinforcing steel, 430 tons of steel;
Construction period: 1,200 days. C product specifications/technical
data: N/a D quantity: N/a e U.S. dollar value: N/a F other information:
N/a response data a response language: Japanese. B best Way to respond:
letter. C from manufacturers only: N/a D information desired from U.S.
firm: N/a e primary buying factor: the lowest bid within the estimated
price range. F other information: pre-screening required to be eligible
for bidding. Pre-screening deadline: 16:00 pm, May 12, 1995. Bid
documents must be obtained directly from the submitting agency, not
from U.S. Embassy. Payment in yen. A issuing agency: Nagoya
Construction Bureau, Japan Highway Public Corporation B financing
agency: N/a C price of bid documents: N/a D purchase bid documents by:
16:00 pm, May 12, 1995. E tender number required in all
communications: N/a F performance bonds required: not required. G
closed Procurement procedure: N/a H bidding procedures: open
competitive tendering. I bid deadline: 14:00 pm, jun. 29, 1995. J other
information: ''kensetsu kogyo shimbun'': 4/5/95. Eligible tender
participants: firms qualified to participate in bidding for this
project must meet all of the following criteria and have their
qualifications for this project screened and confirmed by the director
of the Nagoya Construction Bureau: 1) firms that do not fall under
article 4 of the Contract regulations of Japan Highway Public
Corporation; 2) consortia comprised of two firms pre- qualified for
open competitive tendering on road and earth work by the Nagoya
Construction Bureau for fy 93/94; 3) all consortium member firms must
have -- in the past five years (since 1990) as the main contractor --
actually carried out Construction of a pier of at least 40 meters
height. Note: only Construction projects in which bidder has had a 30
percent or greater share are eligible for review; 4) firms that can
assign to the Construction site a field representative and a full-time
chief engineer or engineering supervisor who meet the following
criteria: have had experience with Construction of a pier as field
representative or as chief engineer or engineering supervisor in the
past five years (since 1990); 5) firms not suspended from designation
in no. 4 zone by the Japan Highway Public Corporation; 6) firms that
can present an adequate plan for Construction of the washimi river
bridge; 7) every consortium member firm must meet the following
criteria: a) has been in operation for at least five years in qualified
business under the Construction business law; B) can assign to the
Construction site on a full-time basis an engineering supervisor
qualified for this project under the Construction business law or a
nationally-licensed chief engineer; and C) has a 30 percent or greater
share of involvement, and the representative firm must have the
greatest share. Firms pre-screened by the Construction minister
regarding items (a) and (B) in evaluation of their management
operations are exempted from these criteria; and 8) firms not related
by capital or personnel to the contractors involved in this project.
Post remarks Post contact/prepared by haomori approved by gtaevs Please
send a copy of your response to: Commercial Officer (FCS TOP), American
Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC341.. (0096) Loren Data Corp. http://www.ld.com (SYN# 0253 19950407\99-0001.SOL)