|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 10,1995 PSA#1321Contract Administration Section, Procurement and Right-of-Way
Department, Nagoya Construction Bureau, Japan Highway Public
Corporation, 4-1-1 Sakae, Naka-Ku, Nagoya-Shi 460, Japan 99 -- JAPAN: POC Tel 81/52/262-7084 FAX N/A S16 Construction product
data a industry sector code: B detailed product description:
Construction Title: Construction of the substructure for the East
Section of tobishima overpass on the second meishin expressway; site:
from kanaoka to kiba, tobishima-mura, ama-gun, aichi-ken; summary: this
project involves Construction of a 910-meter- long Highway, including
bridge substructure work (28 sets of pillar-type piers, 10 sets of
one-story, two-span continuous rigid-frame (prestressed concrete)
piers, one set of inverted ''T''-type abutment); total length: 910
meters; width: main Highway portion 14.00 meters X 2, ramp portion 7.00
meters X 1; earth work volume: 32,000 cubic meters; bridge, etc.:
Substructure work only: main Highway portion at one site for 910
meters, ramp portion at one site for 404 meters; piers: main Highway
portion 28 sets, ramp portion 10 sets; abutment: ramp portion one set;
foundation work: steel pipe piles of 0.8 meters diameter and 29,225
meters total length; main materials to be used: 26,300 cubic meters of
concrete, 3,000 tons of reinforcing steel, 95,200 kilograms of
prestressing steel, 29,200 meters of steel pipe piles. C product
specifications/technical data: N/a D quantity: N/a e U.S. dollar value:
N/a F other information: N/a response data a response language:
Japanese. B best Way to respond: letter. C from manufacturers only: N/a
D information desired from U.S. firm: N/a e primary buying factor: the
lowest bid within the estimated price range. F other information:
pre-screening required to be eligible for bidding. Pre-screening
deadline: 16:00 pm, apr. 17, 1995. Bid documents must be obtained
directly from the submitting agency, not from U.S. Embassy. Payment in
yen. A issuing agency: Nagoya Construction Bureau, Japan Highway
Public Corporation B financing agency: N/a C price of bid documents:
N/a D purchase bid documents by: 16: 00 pm, apr. 17, 1995. E tender
number required in all communications: N/a F performance bonds
required: not required. G closed Procurement procedure: N/a H bidding
procedures: open competitive tendering. I bid deadline: 13:30 pm, May
31, 1995. J other information: ''kensetsu kogyo shimbun'': 4/5/95.
Eligible tender participants: firms qualified to participate in bidding
for this project must meet all of the following criteria and have their
qualifications for this project screened and confirmed by the director
of the Nagoya Construction Bureau: 1) firms that do not fall under
article 4 of the Contract regulations of Japan Highway Public
Corporation; 2) firms pre-qualified for open competitive tendering on
road and earth work by the Nagoya Construction Bureau for fy 93/94, or
consortia comprised of two qualified firms; 3) all consortium member
firms must have -- in the past five years (since 1990) as the main
contractor -- actually carried out Construction of a pier of at least
15 meters height. Note: only Construction projects in which bidder has
had a 30 percent or greater share are eligible for review; 4) firms
that can assign to the Construction site a field representative or a
full-time chief engineer or engineering supervisor who meets the
following criteria: has had experience with Construction of a pier as
field representative or as chief engineer or engineering supervisor in
the past five years (since 1990); 5) firms not suspended from
designation in no. 4 zone by the Japan Highway Public Corporation; 6)
in the case of consortium, every member firm must meet the following
criteria: a) has been in operation for at least five years in qualified
business under the Construction business law; B) can assign to the
Construction site on a full-time basis an engineering supervisor
qualified for this project under the Construction business law or a
nationally-licensed chief engineer; and C) has a 30 percent or greater
share of involvement, and the representative firm must have the
greatest share. Firms pre-screened by the Construction minister
regarding items (a) and (B) in evaluation of their management
operations are exempted from these criteria; and 7) firms not related
by capital or personnel to the contractors involved in this project.
Post remarks Post contact/prepared by haomori approved by gtaevs Please
send a copy of your response to: Commercial Officer (FCS TOP), American
Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC342.. (0096) Loren Data Corp. http://www.ld.com (SYN# 0256 19950407\99-0004.SOL)
99 - Miscellaneous Index Page
|
|