|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 10,1995 PSA#1321U. S. Army Engineer District, Savannah, ATTN: CESAS-EN-EA, P.O. Box 889
(31402-0889) or 100 W. Oglethorpe (31401-3640), Savannah, Georgia C -- DESIGN OF VEHICLE AND OTHER EQUIPMENT MAINTENANCE FACILITIES FOR
THE SOUTH ATLANTIC DIVISION (SAVANNAH & MOBILE DISTRICTS) POC Diego
Martinez at 912/652-5738. 1. CONTRACT INFORMATION: ** a. Nature of
Work: A-E services are expected to be required for the design of Army
and Air Force vehicle and other equipment maintenance facilities in the
South Atlantic Division (Savannah and Mobile Districts) of the Corps of
Engineers (NC, SC, GA, FL, TN, MS & AL). A-E services may include site
investigations, planning, engineering studies, concept design, final
design (option), and construction phase engineering support (option).
Concept designs will usually be completed within 2-3 months of contract
award and final design completed within 4-6 months of concept design
approval. ** b. Contract Award Procedure: A list of at least three most
highly qualified and technically equal firms will be selected using the
primary criteria listed below. The firms will be ranked in order of
negotiation using the secondary criteria listed below. When a directive
for the first project of this type is received, negotiations shall
begin with the top ranked firm. When a directive is received for a
subsequent project, or if negotiation with a firm are unsuccessful,
negotiations shall begin with the next ranked firm that has not been
offered a contract for negotiation. If the list of ranked firms is
exhausted, the negotiation cycle shall begin again with the top ranked
firm. This procedure will be used until 30 September 1996. None of the
projects have been authorized for design and funds are not presently
available for any contracts (See FAR 52.232-18). This announcement is
open to all businesses regardless of size. Large business offerors that
require subcontractors must identify subcontracting opportunities with
small business, woman owned and small disadvantaged business
subcontract plan in accordance with FAR 52.219.9 and DFARS 219.704/705
as part of the Request for Proposal package. The following
subcontractoring goals are the minimum acceptable goals to be included
in the subcontracting plan: OF THE SUBCONTRACTED WORK, 60% to SMALL
BUSINESS, 10% TO SMALL DISADVANTAGED BUSINESS ( A COMPOSITE OF SMALL
BUSINESS), 5% TO WOMAN-OWNED BUSINESS (A COMPOSITE OF SMALL BUSINESS).
Large business firms that intend to do subcontracting must convey
their intent to meet the minimum subcontracting goals on the SF 255,
Block 6. Written justification must be provided if the minimum goals
cannot be provided. For additional information concerning
SUBCONTRACTING PLAN requirements, contact JULIE OLIVER, Contract
Specialist, at 912/652-5899. ** 2. PROJECT INFORMATION: Design of new
and/or renovations of vehicle and other equipment maintenance
facilities with associated energy monitoring and control systems,
communication systems, fire protection and alarm systems, electrical,
high temperature and chilled water systems, water and sewer utilities,
demolition and site development and improvements. The estimated
construction cost of each project is $5,000,000.00 to $10,000,000.00.
** 3. SELECTION CRITERIA: The selection criteria in descending order of
importance are: *** PRIMARY CRITERIA *** a. Specialized experience in
the type of work described in Project Information. The estimates for
this project shall be prepared using the latest Version of MCACES Gold
Software. The software and User's Manual will be provided to the
successful A-E. The drawings will be prepared using graphics created
via Microstaton 32 or Micro/Station PC (4.0) and or AutoCADD Version
11. All drawing files delivered to Savannah District that have been
created using AutoCADD Version 11 must be translated to .dgn files. The
Contractor shall possess the software to enable the full translation of
drawing files from .dwg to .dgn and vice versa. Before final selection
the preselection A-E's may be required to demonstrate the above
compatibility by reproducing a Government supplied standard drawing and
translating it to the Intergraph format above. The method of
translation must be thoroughly described and documented in Block 10 if
the A-E does not have an Intergraph CADD System. The projects must be
designed using SI Metric design requirement. Design drawings and
design analysis will be in hard metric. Automated Review Management
System (ARMS) software will be used in the review process. The A-E will
be required to have a modem or ftp internet access to communicate with
ARMS Central for file transfer. The software and necessary training
will be provided by the Corps at no charge. This project will require
the use of National Institute of Building Sciences Construction
Criteria Base (CCB) CD-ROM disks for the latest guide specifications
and specification editing software, SPECSINTACT. Architect-Engineer
firms will be required to have a current subscription to CCB and a
CD-ROM reader. The A-E selected will be required to submit a Design
Quality Assurance Plan concurrently with their fee proposal.
Information on what is to be contained in this plan will be furnished
upon notification of selection. Firms responding to this announcement
are requested not to transmit this plan with their SF 255. ** b. Past
Performance on contracts with Government agencies and private industry
in terms of cost control, quality of work, and compliance with
performance schedules. ** c. Capacity to accomplish the design in the
required time and dedicate personnel in the following disciplines:
architecture, civil, structural, mechanical, and electrical engineers,
industrial hygienist and topographic surveyors. The design team must
include a Registered Engineer or Registered Architect who is a full
''member'' in good standing of the Society of Fire Protectin Engineers
(SFPE) or an individual who is a registered Fire Protection Engineer
and whose principle duties are Fire Protection Engineering. ** d.
Professional Qualifications of key management and professional staff
members. ** e. Knowledge of the locality, i,e, climatic conditions and
local construction methods. *** SECONDARY CRITERIA *** f. Extent of
participation of SB, SDB, WOB, historically black colleges and
university and minority institutions in the proposed contract team,
measured as a percentage of the estimated effort. ** g. Location of the
firm in the general geographic area of the project. ** h. Volume of DoD
contract awards in the last 12 months as described in Note 24. *** 4.
SUBMITTAL REQUIREMENTS: Firms desiring consideration must submit ONE
(1) copy of SF 255 (revised 11/92) for PRIME and ONE (1) copy of SF 254
for PRIME and each CONSULTANT to the above address by 16 May 1995 to be
considered for selection. Include ACASS number in BLOCK 3b. Call the
ACASS Center at 503/326-3459 to OBTAIN a NUMBER. DEPTH of PRIME and
SUBCONTRACTOR personnel in EACH DISCIPLINE must be shown in BLOCK 4 of
SF 255 and SF 254 to CLEARLY identify the number of personnel in each
firm and discipline. COVER letters and EXTRANEOUS materials are NOT
desired and WILL NOT be CONSIDERED. ** PHONE calls are DISCOURAGED
unless ABSOLUTELY necessary. PERSONAL visits for the PURPOSE of
DISCUSSING this announcement WILL NOT be scheduled. THIS is NOT a
REQUEST for a PROPOSAL. (0096) Loren Data Corp. http://www.ld.com (SYN# 0016 19950407\C-0004.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|