|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 11, 1995 PSA#1322Contract Division, General Affairs Department, Chubu Regional
Construction Bureau, Ministry of Construction, 2-5-1 Sannomaru,
Naka-Ku, Nagoya-Shi 460, Japan 99 -- JAPAN: POC Tel 81/52/962-6311 X2521 FAX N/A S16 Construction
product data a industry sector code: B detailed product description:
Construction Title: Construction of the seishin-tomoe overpass (bridge
structure work) on route one for fy 95; site: nagasaki, shimizu-Shi;
summary: three-span continuous, steel plate surface, box girder bridge;
length 254 meters (70, 110, and 74 meters), width 19.6 to 29.6 meters;
Construction period: approx. 14 months (420 days); main materials to
be used: total steel tonnage 2,290 tons, including 30 tons for six sets
of support bearings; painting at factory 36,000 square meters. C
product specifications/technical data: N/a D quantity: N/a e U.S.
dollar value: N/a F other information: N/a response data a response
language: Japanese. B best way to respond: letter. C from manufacturers
only: N/a D information desired from U.S. firm: N/a e primary buying
factor: the lowest bid within the estimated price range. F other
information: pre-screening required to be eligible for bidding.
Pre-screening deadline: 16:00 pm, apr. 17, 1995. Bid documents must be
obtained directly from the submitting agency, not from U.S. Embassy.
Payment in yen. A issuing agency: Chubu Regional Construction Bureau,
Ministry of Construction B financing agency: N/a C price of bid
documents: N/a D purchase bid documents by: May 18, 1995. E tender
number required in all communications: N/a F performance bonds
required: not required. G closed procurement procedure: N/a H bidding
procedures: open competitive bidding. I bid deadline: 15:00 pm, May 31,
1995. J other information: ''kensetsu kogyo shimbun'': 4/6/95. Eligible
tender participants: 1) firms that do not fall under articles 70 and 71
of the cabinet order concerning budget, auditing, and accounting; 2)
firms pre-qualified for open competitive bidding on steel bridge
superstructure works by the Chubu Regional Construction Bureau; 3)
firms not undergoing bankruptcy procedures; 4) firms that have -- since
1990 as the main contractor -- actually manufactured at their own
factory and constructed on site a multi-span continuous, steel box
girder bridge of at least 90 meters maximum span length. Note: only
Construction projects in which bidder has had a 30 percent or greater
share are eligible for review; 5) firms that can assign to the
Construction site a full-time chief engineer or engineering supervisor
who meets the following criteria: a) is qualified as a certified
first-class Construction supervisor or equivalent or higher; B) has --
since 1990 as the main contractor -- had experience with on-site
Construction of a multi-span continuous, steel box girder bridge of at
least 90 meters maximum span length; and C) in the case of engineering
supervisor, is qualified to supervise designated Construction works; 6)
firms not currently suspended from designation by the director of the
Chubu Regional Construction Bureau; and 7) firms not related by capital
or personnel to the contractors involved in this project. Post remarks
Post contact/prepared by haomori approved by gtaevs Please send a copy
of your response to: Commercial Officer (FCS TOP), American Embassy,
Tokyo, Unit 45004, APO Ap 96337, Refer to TC345.. (0097) Loren Data Corp. http://www.ld.com (SYN# 0421 19950410\99-0003.SOL)
99 - Miscellaneous Index Page
|
|