COMMERCE BUSINESS DAILY ISSUE OF APRIL 13,1995 PSA#1324USPFO for Tennessee, PO Box 40748, Powell Avenue, Nashville, TN
37204-0748 Y -- CONSTRUCT MILAN ARMORY FOR THE TENNESSEE ARMY NATIONAL GUARD,
MILAN, TENNESSEE Sol DAHA40-95-B-0006. Due 062095. Contact Major
Kathryn M Fulkerson, Contract Specialist, 615/532-3217 or LTC James L
Coonce, Contracting Officer, 615/532-3217. Provide labor, materials,
equipment and other services necessary to construct a new National
Guard Armory and related site development. The Armory is load bearing
masonry construction with brick veneer, insulated drainage walls. Since
this project is located in Seismic Zone 2, additional work is required
for meeting the Seismic structural requirements. Floors are slob on
grade with various interior finishes. Foundation is spread footings
with load bearing masonry walls. The majority of the roof structure is
steel bar joist, metal deck with polyisocyanurate insulation and
standing seam metal roof. The high portion of the main armory is
laminated wood arches bearingon masonry pilasters with laminated
purlins and a cementious decking material and polyisocyanurate
insulation. The roof over this raised area is standing seam metal. The
interior walls are primarily painted CMU. Portions of the facility
have suspended acoustical ceiling, while other areas have exposed
structrure, some of which are painted. Floor finishes include sealed
concrete, VCT, ceramic tile and quarry title. Doors are hollow metal in
hollow metal frames. Windows are dark anodized aluminum operable units
and storefront construction. An electrically operted coiling overhead
door is provided. A security vault with vault door and interior
security cabinets are provided. Vault construction is cast in place
reinforced concrete. Dehumidification is provided in the vault. Wire
mesh partitions and steel storage shelving is provided in selected
areas. The mechanical system is a combination of split system natural
gas package units, natural gas unit heaters and interlocked exhaust
systems. Plumbing facilities are provided. Electrical systems including
fire alarms are provided. Provision for roughing in Owner's Intrusion
Detection System (alarm) is provided. Gas service is to be provided by
LP gas system. This will require adjustments to equipment requirements
for Food Service Equipment, for gas fueled equipment and for other HVAC
furnaces and unit heaters. The gas fueled hot water heater will also
require a different orifice. JP gas system shall include orifices for
all gas appliances that will enable units to work with LP Gas Service.
The contractor shall provide 2,000 gallons of LP gas capacity in
either a single 2,000 gallon tank or (2) 1000 gallon tanks at
contractor's option. The contractor will provide all other associated
LP gas work for a full and complete system. At substantial completion
of project, the tank(s) shall be filled to capacity for owners use.
Performance time is 365 calendar days. Plans and specifications will be
available on or about 20 May 1995. A non-refundable certified check or
money order is required for plans and specifications in the amount of
$94.00 made payable to the Treasurer of the United States. The
solicitaton will be furnished at no cost. Plans and specifications will
also be available for review at various plans houses within the state.
Contractors should call the Contract Specialist listed above for these
locations. The estimated construction cost is between $1,000,000.00 and
$5,000,000.00. This project is open to large as well as small business
(unrestricted). (100) Loren Data Corp. http://www.ld.com (SYN# 0137 19950412\Y-0002.SOL)