|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 13,1995 PSA#1324MK-Ferguson of Oak Ridge Company, P.O. Box 2011, Oak Ridge, TN
37831-2011 Y -- MELTON VALLEY STORAGE TANK CAPACITY INCREASE PROJECT SOL 888.
Contact, Richard A. Ray, Subcontract Administrator (615) 241-5265.
MK-Ferguson is a prime contractor to the Department of Energy (DOE)
operations at Oak Ridge, TN. There is an anticipated requirement for
construction of the Melton Valley Storage Tank Capacity Increase
Project at the DOE Oak Ridge National Laboratory. The Melton Valley
Storage Tank Capacity Increase Project includes installation of a
reinforced concrete vault facility housing six 100,000 gallon stainless
steel storage tanks, associated piping, ventilation and control. Each
tank is located in an individual stainless steel lined vault. The tanks
will be procured under another subcontract and be furnished to the
subcontractor to be set in place under this activity. An adjacent Pump
and Valve Vault will house most process mechanical equipment. A
control room will provide for on-site control and interfacing with
central control. Utilities and services to be installed at the facility
include fire and service water, instrument, air, fire alarm, voice/data
communication, and electrical power. The Standard Industrial
Classification Code is 1541. The magnitude of cost is $5 - 10 Million.
Potential bidders must submit the following pre-qualification
information in order to be considered eligible to receive a
solicitation package: (1) A synopsis of your firm's three (3) largest
construction projects which demonstrate experience with similar
facilities, including each client's project manager, point of contact
and telephone number(s); (2) a copy of your firm's environmental,
safety and health program including a letter from your insurer
certifying your firm's Experience Modification Rate (EMR) over the past
three (3) years, and a composite summary of your firms' OSHA 200 Logs
calculated average annual lost-time and recordable injury rate over the
last three (3) years; (3) Proof of financial responsibility to perform
a subcontract of this size including bonding capacities and audited
financial statements or annual reports. MK-Ferguson maintains the right
to determine pre-qualified bidders based upon the criteria. Interested
and capable firms are requested to submit the above pre-qualification
criteria to: R. A. Ray, Subcontract Administrator, MK-Ferguson of Oak
Ridge Company, Procurement Department, P.O. Box 2011, Oak Ridge, TN
37831-2011 by MAY 7, 1995. The solicitation will not be set-aside,
however, small and small disadvantaged companies are encouraged to
participate. Qualified firms will be notified individually. Cost for
subsequent solicitation packages will be $250.00 each, non-refundable
except in the event the project is cancelled prior to issuance of
solicitations. (100) Loren Data Corp. http://www.ld.com (SYN# 0140 19950412\Y-0005.SOL)
Y - Construction of Structures and Facilities Index Page
|
|