|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 19,1995 PSA#1328US Army CECOM, Command, Control, Communications and Computers
Intelligence Electronics Command (C4IEW) Acquisition Center, Fort
Monmouth, New Jersey 07703-5000 ATTN: AMSEL-ACSB-C-DE(OLE) Z -- REVITALIZATION OF BUILDING 1207 SOL DAAB08-95-B-0021 DUE 060895
POC John O'Leary, Contract Specialist, (908)532-2122, Virginia M.
O'Neill, Contracting Officer, (908)532-3019. Provide all plant labor,
material and equipment and perform all work required to
''Revitalization of Bldg 1207 for realignment of Headquarters CECOM,
Fort Monmouth, NJ.'' Except for work described in optional bid items
''A,'' ''B,'' ''C,'' and Unit Bid Price Item. In strict accordance with
drawing Nos. 10733-1 thru 10733-40 and specifications, PR 94-0957. The
scope of work shall include the renovation of the ground and first
floor of the building to office space for the relocation of CECOM to
Main Post. This work includes the construction of demountable partition
walls, restrooms, and interior finish materials. Optional Bid Item
''A'' Provide all plant labor, materials and equipment and perform all
work required to install demountable partition walls with door frames,
for rooms 106 thru 171 on the first floor, Building 1207, Fort
Monmouth, NJ in strict accourance with the Drawing Nos 10733-1 thru
10733-40 and specifications PR 94-0957. Optional Bid Item ''B'' provide
all plant labor, materials and equipment and perform all work required
to ''Install occupancy sensors, power packs, and slave packs for
lighting control at building 1207, Fort Monmouth, NJ.'' In strict
accordance with the drawing Nos. 10733-1 thru 10733-40 and
specifications PR 94-0957. Optional Bid Item ''C'' provide all plant
labor, materials and equipment and perform all work required to
''Install surge suppression devices for distribution panels serving
Building 1207 Fort Monmouth, NJ.'' in strict accordance the drawing
Nos. 10733-1 thru 10733-40 and specifications PR 94-0957. Unit Bid
Price Item, the following Unit Bid Price item will be used where
required and as directed by the Contracting Officer Representitive. The
estimated quantities will be used to replace existing deteriorated
insulated metal building panels. The work includes removal of panels
from window frames and installation of new panels and sealant.
Estimated cost range is between $1,000,000.00 and $5,000,000.00. Site
visit will be specified in IFB DAAB08-95-B-0021. Construction
completion time is 210 days. This solicitation is being issued as an
unrestricted procurement. There will be a charge of $25.00 per set of
drawings and specifications. All checks are to be drawn to ''Finance
and Accounting Officer.'' Payment will not be returned and
specifications need not be returned. Respond in writing to Mr. John
O'Leary, ATTN: AMSEL-ACSB-C-DE(OLE). (0107) Loren Data Corp. http://www.ld.com (SYN# 0116 19950418\Z-0001.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|