COMMERCE BUSINESS DAILY ISSUE OF APRIL 21,1995 PSA#1330USDA Forest Service, Homer Garrison Federal Building, Room 207, 701 N.
First St., Lufkin, TX 75901 Y -- CONSTRUCTION OF CONCRETE BRIDGE, WALKER COUNTY, TEXAS SOL IFB
R8-13-95-28 DUE 061995 POC Contact Point, Sherra Taylor, (409)639-8523,
Contracting Officer, Freida L. Gratz, (409)639-8517 This project
consists of the replacement of an existing failed concrete flood
damaged bridge 200-0.6 over Boswell Creek Crossing on Forest
Development Road 200, located on the Raven Ranger District, Sam Houston
National Forest. Work will include the removal and transporting of
existing flood damaged 60 foot concrete bridge including all abutment,
wingwall, piling and guardrails off of National Forest lands. The
construction of the new concrete bridge, approximately 70 feet long,
will include piling, abutments, wingwalls, concrete approach pads,
bridge approach railing, bridge railing, temporary construction and
permanent signing, reconstruction of the road approaches to the bridge
and the construction of temporary and permanent erosion control
features, structures and work. All responsible sources may submit an
offer which will be considered. When calling be prepared to state name,
address, and solicitation number. Price range of this project is
between $100,000 and $250,000. (0109) Loren Data Corp. http://www.ld.com (SYN# 0096 19950420\Y-0007.SOL)
Y - Construction of Structures and Facilities Index Page
|
|