COMMERCE BUSINESS DAILY ISSUE OF APRIL 26,1995 PSA#1333Bemidji Area Indian Health Service, Room 211, Federal Building,
Bemidji, MN 56601-3060 Y -- CONSTRUCTION OF A SEQUENCING BATCH REACTOR (SBR) WASTE WATER
TREATMENT PLANT, SOL 239-95-B-0003. DUE 060795. Contact Karolyn
Solland, Contract Specialist, 218/759-3392. To be built in New Odanah,
Wisconsin, on the Bad River Indian Reservation, Ashland County,
Wisconsin. The SBR waste water treatment plant shall include a sewer
force main extension and other influent works; three rectangular
concrete treatment basins; two concrete block buildings (a screen
building and a main building) piping between the concrete tanks and the
two buildings; effluent discharge piping to a lagoon and to an outfall;
a water main extension with appurtenances; and access road
improvements. The contractor shall contractor these facilities and
install all process equipment in accordance with the plans and
specifications. Estimated cost range is between $250,000 and $500,000.
Construction period shall be one hundred twenty (120) calendar days
after the date of receipt of written notice to proceed. Liquidated
damages in the amount of $275 per calendar day shall apply. Issue date
is approximately 05/08/95. Requests for solicitations must be in
writing. Indian preference provisions concerning employment and
subcontracting shall be a part of the solicitation and resultant
contract. (111) Loren Data Corp. http://www.ld.com (SYN# 0117 19950425\Y-0009.SOL)