|
COMMERCE BUSINESS DAILY ISSUE OF MAY 4,1995 PSA#1339R&D Contracting Directorate, Wright-Patterson AFB OH 45433-607 A -- HIGH PERFORMANCE MILITARY PRODUCT REALIZATION - PART 2 OF 2 SOL
BAA 95-60-MLK POC Contact William T. Underwood, Contract Negotiator,
(513) 255-3506, or Douglas Harris, Contracting Officer, (513) 255-3506.
D-PREPARATION INSTRUCTIONS: (1) General: Offerors should apply the
restrictive notice prescribed in the provision of FAR 52.215-12,
''Restriction on Disclosure and Use of Data,'' to trade secrets or
privileged commercial and financial information contained in their
submittals. Proposal questions should be directed to one of the points
of contact listed elsewhere herein. Offerors should consider
instructions contained in the WL PRDA and BAA Guide for Industry
referenced in Section A of this announcement. Proposals shall be
submitted in separate volumes, technical and cost, the cost proposal
shall be valid for 180 days. Proposals must reference the above BAA
number. An original and six copies of each volume shall be provided.
All responsible sources may submit a proposal, which shall be
considered against the criteria set forth herein. Offerors are advised
that only contracting officers are legally authorized to commit the
government. (2) Cost Proposal: The cost proposal shall be prepared in
accordance with FAR 15.804-6 and shall include a Standard Form 1411,
with all supporting data, in order to allow for a complete review by
the Government. The cost proposal shall include all supporting
information including breakdown of labor hours by category, materials,
travel, computer, subcontracting, and other direct and indirect costs.
A summary page showing the total for each category by phase and cost
proposal page references should be included. An analysis of each major
subcontractor must be performed by the offeror in accordance with FAR
15.806-2 and included in the cost proposal. Details of the cost
sharing to be undertaken by the offeror should be included in the cost
proposal. (3) Technical Proposal: The technical proposal shall include
a discussion of the nature and scope of the technical approach.
Additional information on prior work in this area, descriptions of
available equipment, data and facilities, and resumes of personnel who
will be participating in this effort should also be included. The
technical proposal shall include: (a) a Statement of Work (SOW)
detailing the technical tasks proposed to be accomplished under the
proposed effort and suitable for contract incorporation. Offerors
should refer to the WL Guide referenced in Section A to assist in SOW
preparation, (b) statement of intention, if any, to use foreign
nationals, (c) break out of person hours for each major task in the
SOW, and, (d) names and qualifications of subcontractors, and level of
effort to be subcontracted. Offerors are notified the SOW may be
incorporated, or any part thereof, by reference, in any resulting
award. The paragraph numbering used in the Technical Proposal for the
technical approach discussion, the SOW tasks, and the Cost Proposal
shall correlate. Travel is projected to include, but not be limited to:
Contract Kick-off Meeting, Annual Industry Reviews, Semiannual,
Quarterly and End of Contract Reviews at locations selected by the
Government. Any questions concerning the technical proposal or SOW
preparation shall be referred to the Technical Point of Contact cited
in this announcement. (4) Page Limitations: Technical proposals shall
not exceed 50 pages, double spaced, single-sided on 8.5'' x 11'' paper
using 12 pitch or larger type with 1.25'' minimum margins. The page
limitation includes all information, i.e. indexes, photographs,
foldouts, and appendices. Pages in excess of this limitation will not
be considered by the Government. Cost proposals are not page limited.
(5) Preparation Cost: This announcement does not commit the Government
to pay for any proposal preparation cost. The cost of preparing
proposals in response to this BAA is not an allowable direct charge to
any resulting contract or any other contract. It is, however, an
allowable expense to the normal bid and proposal indirect cost as
specified in FAR 31.205-18. E-BASIS FOR AWARD: The selection of one or
more proposals will be based on a complete evaluation of offerors'
proposals to determine the overall merit of each in response to this
announcement. The technical aspect, which is ranked first in order of
priority, shall be evaluated based upon the following criteria which
are of equal importance: (a) soundness of approach in baselining,
demonstrating, and measuring improvements, (b) understanding of the
problem with cost drivers and improvement barriers identified, (c)
special technical factors including personnel qualifications,
facilities availability, and customer tie(s). After the technical
aspect, cost is ranked second in order of priority and will be
evaluated for the quality and quantity of cost share proposed, as well
as reasonableness, realism, and completeness. The technical and cost
information will be evaluated at the same time. No further evaluation
criteria will be used in the selection process. The Government reserves
the right to select for award of a contract, cooperative agreement, or
a grant (for universities and non-profit institutions), any, all, part
or none of the proposals received. F-POINTS OF CONTACT: Direct
technical questions to Mr. Brench Boden at (513) 255-5674, e-mail
bodenbl@ml.wpafb.af.mil. Direct procurement questions to Mr. William
Underwood at (513) 255-3506. (0122) Loren Data Corp. http://www.ld.com (SYN# 0003 19950503\A-0003.SOL)
A - Research and Development Index Page
|
|