COMMERCE BUSINESS DAILY ISSUE OF MAY 11,1995 PSA#1344US Army Engineer District, Fort Worth, P.O. Box 17300, 819 Taylor
Street, Room 13A42, Fort Worth, TX 76102-0300 Z -- INDEFINITE QUANTITY CONSTRUCTION CONTRACT WITH TIME AND MATERIALS
PROVISIONS; FORT HOOD, KILLEEN, TEXAS SOL DACA63-95-R-0030 DUE 063095
POC Jan Cook, Contract Specialist, 817/334-3476. Indefinite quantity,
multi-task construction contract, with time and materials provisions
and fixed labor rates, for a wide variety of maintenance, repair, and
minor construction tasks in support of the Directorate of Public Works,
Fort Hood, Texas. Work will be performed at (or in the vicinity of)
main Fort Hood and North Fort Hood and at various U.S. Army Reserve
Centers within the state of Texas. The objective of the contract is to
provide expeditious execution of task orders for general construction
work which will vary from site to site. Specific task orders will be
issued by the Contracting Officer in accordance with the unit price,
schedule and specifications. Contract duration will be an initial
12-month period with options for two additional 12-month periods to be
exercised at the discretion of the Government. The maximum estimated
contract amount for the base and for each additional 12-month period is
$13,665,000. Task orders totaling not less than $30,000 and not more
than $1,000,000.00 and no more than a (cumulative) total of $5,000,000
may be outstanding at any given time. The Government will obligate to
the contractor a minimum of $300,000.00 for the base year and $150,000
for each option year (upon exercise of each option year). This
guaranteed fee is a recordable obligation at the time of award and, as
such, will be fully funded upon contract award. The contractor will be
required to furnish all labor, materials, permits, equipment,
personnel, and services necessary to manage and accomplish designated
deliveries which will include surveying the problem, recommending a
solution, and remediating the problem in a timely and efficient manner.
Task orders will include a variety of trades including (but not limited
to) biologist, environmentalist, environmental abatement (asbestos and
lead-based paint) technicians, agronomist, computer specialist,
carpentry, plumbing, road repair, roofing, excavation, demolition,
concrete, topographic surveyors, roofers, masonry, welding, and
engineering (general, civil, mechanical, electrical, structural, fire
protection, and/or safety). Contractors must have a minimum of two
years' related experience and must possess all state and locally
required licenses for this type work within the state of Texas in the
areas specified in the solicitation. Offerors will be required to
submit cost and technical proposals as stated in the solicitation. The
following technical evaluation criteria will be used for selection:
(1) prime contractor's qualifications and past performance (with
various subitems), (2) project management plan (with various subitems),
and (3) cost/price. Proposals from large business firms must comply
with FAR Clause 52.219-9 regarding the requirement for submission of a
subcontracting plan. The Fort Worth District subcontracting goals are
for specified percentages of the contractor's total planned
subcontract amount to be placed with the following: 60.3% with small
business,, 9.8% with small disadvant- taged business, 2.9% with
women-owned small business, and 5.5% with historically black colleges
and universities or minority institutions. The subcontracting plan will
be required as a proposal submission item. A preposal conference will
be held during the solicitation period (details to be provided in the
solicitation). Specifications (no drawings) available at $20.00 per
set. Request by mail must include payment in the applicable amount by
company check or money order payable to F&A Officer, USAED FTW and sent
to: USACE, ATTN: Room 13A42, Post Office Box 17300, 819 Taylor Street,
Fort Worth, Texas 76102-0300. **NO EXPRESS MAIL PROCEDURES WILL BE
UTILIZED IN INITIAL MAILING OF SPECIFICATIONS.** No refund will be made
and materials need not be returned. If project is cancelled or no award
is made, cost of specifications will be refunded only upon written
request. Solicitation to be issued on or about 29 May 1995. Date for
receipt of proposals on or about 30 June 1995. Applicable SIC Code is
1542. Small business size standard is $17.0 million. This project will
be issued unrestricted. All responsible sources may submit a proposal
which will be considered by the agency. See Numbered Note(s): 1.
(0129) Loren Data Corp. http://www.ld.com (SYN# 0160 19950510\Z-0002.SOL)