COMMERCE BUSINESS DAILY ISSUE OF MAY 15,1995 PSA#1346US Army Corps of Engineers, Ft. Worth District, P.O. Box 17300 ATTN:
CESWF-ED-MC, Room 6A18, 819 Taylor Street, Fort Worth, TX 76102-0300 C -- POTENTIAL FIXED PRICE CONTRACTS FOR A-E SERVICES IN DESIGN OF
REPAIR/UPGRADE OF UTILITY OF UTILITY SYSTEMS IN THE FORT WORTH DISTRICT
AREA OF RESPONSIBILITY, PRIMARILY LA, NM, AND TX SOL DACA63-95-R-0057
POC Jerrell Freeman, (817/334-2262). 1. CONTRACT INFORMATION: The work
may involve Design, Drafting, Planning, Studies and Site Investigation
associated with this type of project. All work must be done by or under
the direct supervision of licensed professional Engineers or
Architects. The intent of this announcement is to gather responses from
firms interested in performing this type work for the Fort Worth
District. When a project is identified we will select a firm from this
list, until that time no selection actions will be done. This list of
firms will be used for this type of project through July 1996. No firm
will receive more than one award from this announcement. The estimated
maximum amount per contract is $1,500,000.00. If a large business firm
is selected for a contract under this announcement and the amount
exceeds $500,000.00 it must comply with the FAR clause 52.219-9
requirement for SB/SDB subcontracting plan. The Fort Worth District
goal is that 60.3% of the intended subcontracted amount be set aside
for SB, SDB and Women Owned Businesses (WOB) with minimums of 2.9% for
WOB and 9.8% for SDB. The plan is not required as part of this
submittal. 2. PROJECT INFORMATION: Utility systems could include
primary/secondary electrical distribution, potable water, natural gas,
sanitary sewer, storm drainage, steam-condensate distribution, fire
protection water and similar systems, including all necessary
appurtances. New systems and upgrade or renovation of existing systems
may be required. Size of projects may be major work throughout an
installation or small localized projects. All types of materials
associated with each individual system may be encountered. There is a
possibility of encountering HTW problems on some of the projects.
Projects may require application for local, state, federal permits, for
compliance with safety/environmental requirements etc.. Projects may
require design using the metric system. Services during the project
construction phase may also be required. 3. SELECTION CRITERIA: See CBD
Note 24 (Monday edition) for general description of selection process.
Selection criteria in descending order of importance are as follows:
(a) Specific Experience and Technical Competence: The selected team
must demonstrate recent expertise in the design of Repair/Upgrade of
Utility Systems. It must have designed at least one project of this
type within the past five years. The team proposed must have recent
experience in complying with NPDES pollution prevention plan for at
least one of the three states listed, current knowledge of fire
protection codes including MIL- HDBK-1008B and general experience in
the possible specialty areas associated with Utility Systems as listed
above. (b) Professional Capabilities: This type of project will
require expertise in the disciplines of electrical, mechanical, civil
and structural engineering, cost estimating, landscape architecture,
and environmental design/remediation expertise. (c) Firms must show
adequate team capacity to design a project of construction cost of
$5,000,000.00 within a 6 month period. (d) Demonstrated past
performance with respect to cost control, quality of work, and
compliance with performance schedules. (e) Preparation of
specifications, construction cost estimates on IBM compatible
equipment. Use of M-CACES software. Auto CADD and Intergraph compatible
CADD system. (f) Extent of participation of WOB, SB and SDB in the
proposed contract team, measured as a percentage of the estimated
effort. (g) Amount of DOD contract awards 12 months prior to the
selection. 4. SUBMITTAL REQUIREMENTS: (a) See Note No. 24 for general
submission requirements. To be considered interested firms must provide
one submittal package including an original SF 254 and SF 255 no later
than 4:30 p.m. on the 30th day after the date of this announcement to
be considered. The 11/92 version of the forms must be used. If the
30th day is a Saturday, Sunday or Federal Holiday, the deadline is 4:30
p.m. of the next business day. (b) Responding firms must submit a
current and accurate SF 254 for themselves and each proposed
consultant. It must be provided for the specific office proposed to do
the work. Indicate in Block No. 4 of SF 254 if your firm is a Large,
Small, Small and Disadvantaged or Woman-Owned Business. To be
classified as a small business, a firm's average annual receipts or
sales for the preceding three fiscal years, must not exceed $2.5
million. (c) Submit only one SF 255, completed in accordance with the
instructions. It must contain information in sufficient detail to
identify the team (prime and consultants) proposed for the contract.
(d) Include CBD announcement number in Block NO. 2b of the SF 255. (e)
In Block No. 4 of the SF 255, insert only the number of personnel
proposed for potential project (not necessarily your total capacity).
Consultants as (A) and in-house personnel as (B). (f) In Block NO. 6 of
the SF 255, identify the discipline/ service to be supplied by each
consultant. (g) Provide brief resumes of the on-staff or consultant
employees you intend to use to perform the work in the anticipated
design time and the project assignment they will perform in Block No.
7 of your SF 255. Block No. 7 may be repeated as needed to identify all
the major discipline and key team members. Selection will be based on
the total team members presented in your SF 255, primarily block No. 7.
(h) In Block 10 of your SF 255 include a draft design quality control
plan. It should include a brief presentation of the internal controls
and procedures that you us to insure that a quality design is produced.
(i) Solicitation packages are not provided for A-E contracts. This is
not a request for proposal (see Note No. 24). (0131) Loren Data Corp. http://www.ld.com (SYN# 0013 19950512\C-0001.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|