U. S. ARMY ENGINEER DISTRICT, MOBILE, ATTN: CESAM-EN-MN, P. O. BOX 2288,, MOBILE ALABAMA 36628-0001 OR 109 ST., JOSEPH STREET MOBILE ALABAMA 36602

C -- A-E DESIGN OF WASTE INCINERATORS, MILAN ARMY AMMUNITION PLANT, TENNESSEE POC Contact Mr. Dan Mizelle, 334/441-5741, Contracting Officer, Gene L. Curtis (Site Code DODAAC) 1. CONTRACT INFORMATION: (Refer to RFP Number DACA01-95-R-0063) A-E services are required for design and preparation of plans, specifications, and cost estimate for the Envir-Explosive Waste Incinerator and the Envir-Contaminated Waste Incinerator at Milan Army Ammunition Plant, Tennessee. This announcement is open to all businesses regardless of size. The contract is anticipated to be awarded in October 1995. If a large business is selected for this contract, it must comply with FAR 52.219-9 regarding the requirement for a subcontracting plan for that part of the work it intends to subcontract. The subcontracting goals for this contract are a minimum of 60% of the contractor's intended subcontract amount be placed with small businesses (SB), including small disadvantaged businesses (SDB), and 7% be placed with SDB. The subcontracting plan is not required with this submittal. 2. PROJECT INFORMATION: The project will consist of providing and installing all required equipment for a complete incinerator facility. This incinerator facility will be used to burn explosive waste in lieu of open burning or open detonation. This work includes grading, paving and extensions to existing facilities. The incinerator shall be designed to meet all Federal and State of Tennessee air pollution requirements. Design of this facility shall be based on the standard explosive waste incinerator that is currently in use at Tooele Army Depot. The estimated construction cost is between $5-10 million. The final design drawing files shall be submitted in AutoCadd Version 12 or Microstation 32 drawing file format. Submittal of the magnetic tape or diskettes is required in addition to the final vellum plots. 3. SELECTION CRITERIA: The contract will require the following registered disciplines: (1) Architect; (2) Civil Engineer; (3) Environmental Engineer registered in the State of Tennessee with applicable experience in dealing with permits at the local, state, and federal level of Government; (4) Electrical Engineer; (5) Mechanical Engineer; (6) Registered Fire Protection Engineer or a Registered Professional Engineer with a minimum of 4 years of Fire Protection System Design Experience; (7) Instrumentation/Controls Engineer; (8) Project Manager. Dedicated Cost Estimators are required. Evaluation of each disciplines will consider education, registration, and relevant experience. Resumes (Block 7 of the SF 255) must be provided for these disciplines, including consultants. Additional evaluation factors in order of importance: (1) Specialized experience in Design of Explosive Waste Incinerators; (2) Specialized experience in Design of Contaminated Waste Incinerators; (3) Specialized experience in Resource Conversation and Recovery Act (RCRA) Part B and air pollution control permitting; (4) Capability to design the projects concurrently; (5) Experience with automated cost estimating systems (IBM/MS-DOS compatible ''M-CACES Gold'' will be used for these projects. The software, user manual and database will be provided by the Mobile District to the selected firm.); (6) Capability to provide topographic surveys; (7) Capability to provide construction phase services, such as shop drawing reviews, and site visits. (B) Quality Management Plan: In Block 10 of the SF 255 describe the firms's quality management plan, including the team's organization including and organizational chart, quality assurance, cost control, and coordination of the inhouse work with consultants. (C) Past performance on contracts with respect to cost control, quality of work, and compliance with performance schedules. (D) Geographic location with respect to the project site. (E) Amount of DOD awards during the past 12 months. 4. SUBMISSION REQUIREMENTS: Firms must submit a copy of their SF 254 and SF 255, and a copy of each consultant's SF 254. The 11/92 edition of the forms must be used, and may be obtained from the Government Printing Office. They are also available from commercial software suppliers for use with personnel computers and laser printers. These must be received in the Mobile District Office (CESAM-EN-MN) not later than close of business on the 30th day after the date of publication of this solicitation in the Commerce Business Daily. If the 30th day is a Saturday, Sunday, of Federal holiday, the deadline is the close of business on the next business day. Include ACASS number in Block 3b. Call the ACASS Center at 503-326-3459 to obtain a number. Solicitation packages are not provided. This is not a request for proposal. As required by acquisition regulations, interviews for the purpose of discussing prospective contractors' qualifications for the contract will be conducted only for those firms considered most highly(0136)

Loren Data Corp. http://www.ld.com (SYN# 0030 19950517\C-0013.SOL)


C - Architect and Engineering Services - Construction Index Page