COMMERCE BUSINESS DAILY ISSUE OF MAY 18,1995 PSA#1349Sacramento Alc/Pkxd, 3237 Peacekeeper Way/Suite 17, Mc Clellan Air
Force Base Ca 95652-1060 N -- INDUCTION MLTG FURNACE & POURING SY SOL F04699-95-R-0154 DUE
070395 POC For copy, contact the info office indicated., For additional
information contact Melby.K8s/Pkocc/916-643-3795 The closing date of 03
Jul 95 is an approximation only. McClellan AFB is purchasing two (2)
4000 to 6000 lb capacity coreless induction melting furnaces with 1500
kilowatt to 2000 kilowatt power supplies each and automatic iron
pouring system. The iron melting and pouring furnace system shall be
required to melt gray and ductile iron and accurately pour metal by
weight into individual molds indexing through the pouring station for
automotive and Department of Defense castings. INDUCTION MELTING
FURNACE REQUIREMENTS: The coreless induction melting furnaces shall be
required to produce a total of 7500 deliverable pounds per hour
continuously. The furnaces must also be able to produce 12,500 pounds
of metal per hour for two (2) hours including total storage reserves of
metal (melters and holder described below) and at the end of the two
hour run, nearly all the metal must be consumed. Furnaces must
efficiently melt small quantities of metal ranging from 1500 to 3000
pounds. Furnaces shall have a stirring characteristic indicated by a
meniscus height to furnace diameter ration of 0.1 to 0.2. Furnaces
shall include appropriately sized transformers (12 KV primary) for each
melting system, one (1) common water system complete with pump stand
and cooling tower to cool two (2) melting furnaces, one (1)
pouring/holding furnace and one (1) additional government provided
combination box and swing coil furnace. Furnaces shall also have
individual hydraulic power supplies for each furnace, one (1) common
hydraulic furnace lining removal system, automatic furnace lining
sintering & cold start-up system. The furnace coils shall be protected
by a battery operated pump system which automatically activates upon
power failure. AUTOMATIC IRON POURING SYSTEM: The pouring system shall
receive iron from melting furnaces and accurately pour metal by weight
into individual molds indexing through the pouring station. Pour
weights shall range from approximately 30 pounds to 250 pounds per
mold. Pouring unit shall include load cell weighing system under pour
station conveyor coupled with pouring system controls. Pouring furnace
shall hold 6000 pounds of iron with a working capacity of 3000 pounds
of iron. Pouring from the unit shall be via an adjustable rotating
stopper rod metering system using a programmable and/or self-learning
programmable rate with feedback from the load cell weighing system.
Furnace shall be heated with coreless induction coil with 200 kilowatt
power supply and coupled to common water system for the melting
furnaces. Pouring furnace shall be capable of back tilting to
completely empty the furnace at the end of each production run. Pouring
furnace shall be mounted on indexing carriage with powered ''X'' and
''Y'' movement to allow for different pouring basin locations on the
molds and aborts beside the mold line. 1 ea Applicable to: CERP Program
Destination: McClellan Air Force Base CA 95652-1060 Estim Delivery: 31
Dec 95 1 ea Descriptions, quantities, locations are based on the best
available data at the time. This is an All or None requirement. All
responsible sources may submit a proposal/quotation that shall be
considered by the Agency. It is the intent of the Government to
purchase a commercially available furnace, without the need for new
development; therefore, the contractor shall be required to demonstrate
that they have produced and sold furnaces for a minimum of ten (10)
years. Any response should state whether your organization (together
with its affiliates) is a large or small business and whether it is a
small disadvantaged business. All requests must state that they are not
currently on the consolidated list of debarred, suspended and
ineligible contractors or otherwise ineligible to receive Government
contracts. All interested parties are urged to provide their CAGE code
and CEC code with their written or FAX request at (916) 643-4157.
Verbal requests will not be honored. An Ombudsman has been appointed
for this acquisition. The only purpose of the Ombudsman is to receive
and communicate his/her concern during the proposal development phase
of this acquisition. Potential offerors should use established channels
to request information, pose questions, and voice concerns before
resorting to use of the Ombudsman. Potential offerors are invited to
contact Allen Taylor at (916) 643-5209, with serious concerns only.
Routine communication concerning this acquisition should be directed to
the buyer listed elsewhere in this synopsis. The approximate
issue/response date will be 02 Jun 95. No telephone requests. Only
written or faxed requests received directly from the requestor are
acceptable. All responsible sources may submit a bid, proposal, or
quotation which shall be considered. Specifications, plans, or drawings
relating to the procurement described are incomplete or not available
and cannot be furnished by the Government. (0136) Loren Data Corp. http://www.ld.com (SYN# 0072 19950517\N-0001.SOL)
N - Installation of Equipment Index Page
|
|