Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 19,1995 PSA#1350

Supplies Division, Second District Port Construction, Bureau, Ministry of Transport, 5-57 Kita-Nakadori, Naka-Ku, Yokohama- Shi 231, Japan

99 -- JAPAN: POC Tel 81/45/211-7413 FAX N/A S16 Construction product data a industry sector code: B detailed product description: Construction Title: phase- nine preparation of the site for Tokyo international airport; site: reclaimed land offshore of haneda airport, ota-Ku, Tokyo; summary: earth work: excavation and Transport of 741,500 cubic meters of surplus soil and 4,600 cubic meters of pit sand; Construction period: approx. 12 months. C product specifications/technical data: N/a D quantity: N/a e U.S. dollar value: N/a F other information: N/a response data a response language: Japanese. B best way to respond: letter. C from manufacturers only: N/a D information desired from U.S. firm: N/a e primary buying factor: the lowest bid within the estimated price range. F other information: pre-screening required to be eligible for bidding. Pre-screening deadline: 16:00 Pm, May 26, 1995. Bid documents must be obtained directly from the submitting Agency, not from U.S. Embassy. Payment in yen. A issuing Agency: Second District Port Construction Bureau, Ministry of Transport B financing Agency: same as above. C price of bid documents: N/a D purchase bid documents by: June 23, 1995. E tender number required in all communications: N/a F performance bonds required: not required. G closed Procurement procedure: N/a H bidding procedures: open competitive tender. I bid deadline: 14:00 Pm, July 6, 1995. J other information: ''kensetsu kogyo shimbun'': 5/16/95. Eligible tender participants: 1) firms that do not fall under articles 70 and 71 of the cabinet order concerning budget, auditing, and accounting; 2) firms pre-qualified for open competitive bidding on earth work by the Second District Port Construction Bureau; 3) firms that score at least 1,350 points in earth work in a formula calculated from bidding company's objective criteria at the time of application for qualification; 4) firms that have -- since 1990 as the main contractor -- actually carried out earth work of at least 500,000 cubic meters in a currently-used airport; 5) firms that can assign to the Construction site a full-time chief engineer or engineering supervisor who meets the following criteria: a) is qualified as a certified first-class Construction supervisor; B) has since 1990 had experience with a Project as described in item (4) above as chief engineer or engineering supervisor; and C) in the case of engineering supervisor, is qualified to supervise designated Construction works; 6) firms not related by capital or personnel to the contractors involved in this Project; 7) firms not currently suspended from designation by the Director of the Second District Port Construction Bureau; and 8) firms not undergoing bankruptcy procedures. This Project is open only to pre-qualified consortia as separately announced. Post remarks Post contact/prepared by haomori approved by gtaevs Please send a copy of your response to: Commercial Officer (FCS TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC387.. (0137)

Loren Data Corp. http://www.ld.com (SYN# 0436 19950518\99-0004.SOL)


99 - Miscellaneous Index Page