COMMERCE BUSINESS DAILY ISSUE OF MAY 19,1995 PSA#1350Postal Service, NY Facilities Service Office, 2 Hudson Place, Hoboken,
NJ 07030-5502 Y -- PREQUALIFICATION STATEMENTS ARE SOLICITED FROM CONTRACTORS
INTERESTED IN BEING PLACED ON THE PREQUALIFIED CONTRACTORS LIST FOR
REMOVING, SUPPLYING AND INSTALLING AN HVAC SYSTEM AT THE MID-ISLAND
MAIL PROCESSING FACILITY Sol 332495-95-A-0169. Due 061295. Contact
Person: Joseph C. Dimino, Project Coordinator (201) 714-5449. This is
a Solicitation to prequalify firms to remove and replace the existing
aquifer air conditioning system, part of the heating system and remove
the desiccant system from the Mid-Island Mail Processing Facility
located at 160 Duryea Road, Melville, New York 11747-8000. The facility
is approximately 258,000 square feet, with an estimated cost range of
$1,200,000.00 to $1,600,000. Planned construction starting date is
100195. Interested firms are to submit their Prequalification
Statements to the New York Facilities Service Office, Attn: Joseph C.
Dimino, 2 Hudson Place - 5th Floor, Hoboken, NJ 07030-5502. The
Statements will be evaluated by the contractig officer's staff. Primary
factors that will be considered are: 1) construction experience with
removal and replacement of large HVAC systems in occupied facilities
and the ability to maintain heating and air conditioning during
construction in the form of a minimum of two projects successfully
completed of comparable size and complexity, or larger, within the last
5 years. This should include names, and telephone number of references,
such as owners; 2) Financial stability and bonding capacity in the form
of latest current financial statement(s) Names, Address of Bonding
Company, including Bonding capacity; 3) Record of on-time project
completion, in the form of project schedules of two previous projects
successfully completed; 4) Project Management capability in the form of
names, and credentials of key project management personnel; 5) company
organization, in the form of an organizational chart; 6) Minority
participation and commitment,in the form of your firm's minority
utilization goals for this project; 7) Company safety program, in the
form of your safety record in the past five years; 8) Geographic
location of your firm. Applicants will be evaluted by a USPS committee,
and all firms will be advised within 60 days of closing of this Notice
of Intent as to prequalification status. Firms selected as being the
most qualified will be placed on the prequalification list. Following
evaluation, Plans and Specifications will be available on or about
August 7, 1995. Interested firms that meet the minimum criteria stated
above may submit their Contractor Prequalification Statement.
Contractor Prequalification Statements will not be returned. This is
not a request for proposal. (136) Loren Data Corp. http://www.ld.com (SYN# 0145 19950518\Y-0005.SOL)