COMMERCE BUSINESS DAILY ISSUE OF may 24,1995 PSA#1353USPFO for Washington, ATTN: Contracting Office, Bldg 32, Camp Murray,
Tacoma, WA 98430-5170 Y -- CONSTRUCT MOBILITY STORAGE WAREHOUSE, CAMP MURRAY, WASHINGTON AIR
NATIONAL GUARD STATION, TACOMA, WA SOL DAHA45-95-B-0005 POC Joanie
Dobesh, Contracting Office, 206/512-8311; Captain Robert McGaughey,
206/512-8566 Furnish all plant, labor, equipment, materials, tools and
other items required to construct Mobility Storage Warehouse.
Principal features include but are not limited to: Preparation of the
existing site and construction of new foundations and slab-on-grade;
construction of a new pre-engineered metal building with five bays and
two internal offices and a latrine; new concrete paving for approach
apron to the new building; and new and relocated electrical and
mechanical utilities and systems in support of the new building. ECC is
between $100,000 and $500,000. Time of completion is 120 calendar days
from the receipt of Notice to Proceed. Solicitations will be available
on or about 8 June 1995 on a first come, first serve basis by written
or faxed requests. FAX number, 206-512-8933. The proposed construction
is a 100 percent set-aside for small disadvantaged business concerns
(SDB). See Note 4. (0142) Loren Data Corp. http://www.ld.com (SYN# 0083 19950523\Y-0004.SOL)