COMMERCE BUSINESS DAILY ISSUE OF may 31,1995 PSA#1357U.S.Army Engineer Distrtict, Norfolk, ATTN: CENAO-CT, 803 Front Street,
Norfolk, Virginia 23510-1096 Z -- MAINTENANCE DREDGING, NORFOLK HARBOR CHANNEL AND ANCHORAGE
OPPOSITE SEWELLS POINT, HAMPTON ROADS, VIRGINIA SOL DACW65-95-B-0035
DUE 071895 POC Contract Specialist, Maryellen Maurer, (804)441-7551 The
project consists of maintenance dredging portions of Norfolk Harbor
Channel to depths of 46 feet, 47 feet, and 52 feet, and maintenance
dredging of the West Anchorage opposite Sewells Point to a depth of 40
feet, all with an allowable overdepth of 1 foot. The contractor shall
place all dredged material in the Craney Island Dredged Material
Management Area. The work, including estimated accretion to 1 September
1995, involves dredging approximately 560,000 cubic yards of material
from the Channel and 300,000 cubic yards from the Anchorage. Magnitude
is estimated between $1,000,000 and $5,000,000. Duration of the
project is 120 calendar days. To obtain solicitation documents, mail
check or money order (payable to FAO Norfolk District) in the amount of
$11.00 per set (non-refundable) to the address shown above. TELEPHONE
REQUESTS WILL NOT BE HONORED. Point of contact for technical questions
is Richard Klein (804)441-7243. (0146) Loren Data Corp. http://www.ld.com (SYN# 0134 19950530\Z-0038.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|