|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 2,1995 PSA#1359US Army Corps of Engineers, Ft. Worth District, P.O. Box 17300 ATTN:
CESWF-ED-MC, Room 6A18, 819 Taylor Street, Fort Worth, TX 76102-0300 C -- POTENTIAL FIXED PRICE CONTRACT FOR A-E SERVICES IN DESIGN OF
AIRCRAFT MAINTENANCE FACILITIES IN THE FORT WORTH DISTRICT AREA OF
RESPONSIBILITY, PRIMARILY, PRIMARILY LA, NM, AND TX SOL
DACA63-95-R-0059 POC Jerrell Freeman, (817/334-2262). 1. CONTRACT
INFORMATION: The work may involve Design, Drafting, Planning, Studies
and Site Investigation associated with this type of project. All work
must be done by or under the direct supervision of licensed
professional Engineers or Architects. The intent of this announcement
is to gather responses from firms interested in performing this type of
work for the Fort Worth District. When a project is identified we will
select a firm from this list, until that time no selection actions
will be done. This list of firms will be used for this type of project
through August 1996. Qualified firms will be selected with no firm
receiving more than one award from this announcement. The estimated
maximum amount per contract is $1,500,000.00. If a large business firm
is selected for a contract under this announcement and the amount
exceeds $500,000.00 it must comply with the FAR clause 52.219-9
requirement for SB/SDB subcontracting plan. The Fort Worth District
goal is that 60.3% of the intended subcontracted amount be set aside
for SB, SDB and Women Owned Businesses (WOB) with minimums of 2.9% for
WOB and 9.8% for SDB. The plan is not required as part of this
submittal. 2. PROJECT INFORMATION: Aircraft maintenance facilities
typically include hangar bays, shop administrative areas, parts storage
areas, fire protection, compressed air distribution system, petroleum,
oils and lubricant storage and disposal facilities, and associated
safety requirements. Facility may require site development for utility
connections, paving for aircraft parking, pollution prevention plan,
miscellaneous out buildings, demolition and disposal of existing
facilities with necessary HTW remediation, fuel dispensing facility,
and other requirements related to an aircraft maintenance facility.
Design may require the use of the metric system. Services during the
project construction phase may also be required. 3. SELECTION CRITERIA:
See CBD Note 24 (Monday edition) for general description of selection
process. Selection criteria in descending order of importance are as
follows: (a) Specific Experience and Technical Competence: The selected
firm must demonstrate expertise in the design of aircraft maintenance
facilities. It must have designed at least two within the past five
years. The team proposed must have experience in adapting standard
designs to a specific site, experience in Air Force fire suppression
systems such as AFFF systems, have recent experience in complying with
NPDES pollution prevention plan for at least one of the three sites
listed, current knowledge of fire protection codes including
MIL-HDBL-1008B and general experience in the possible specialty areas
associated with aircraft maintenance facilities as listed above. (b)
Professional Capabilities: This type of project will require expertise
in the disciplines of architecture, electrical, mechanical, civil and
structural engineering, cost estimating, fire protection and
environmental considerations. (c) Firms must show adequate team
capacity to design a project with construction cost of $5,000,000.00
within a 6 month period. (d) Demonstrated past performance with respect
to cost control, quality of work, and compliance with performance
schedules. (e) Preparation of specifications and construction cost
estimates on IBM compatible equipment. Use of M-CACES software. Auto
CADD and Intergraph compatible CADD system. (f) Extent of participation
of SB, SDB and WOB in the proposed contract team, measured as a
percentage of the estimated effort. (g) Amount of DOD contract awards
12 months prior to the selection. 4. SUBMITTAL REQUIREMENTS: (a) See
Note No. 24 for general submission requirements. To be considered
interested firms must provide one submittal package including an
original SF 254 and SF 255 no later than 4:30 p.m. on the 30th day
after the date of this announcement. The 11/92 version of the forms
must be used. If the 30th day is a Saturday, Sunday or Federal Holiday,
the deadline is 4:30 p.m. of the next business day. (b) Responding
firms must submit a current and accurate SF 254 for themselves and each
proposed consultant. It must be provided for the specific office
proposed to do the work. Indicate in Block No. 4 of SF 254 if your firm
is a Large, Small, Small and Disadvantaged or Woman-Owned Business. To
be classified as a small business, a firm's average annual receipts or
sales for the preceding three fiscal years, must not exceed $2.5
million. (c) Submit only one SF 255, completed in accordance with the
instructions. It must contain information in sufficient detail to
identify the team (prime and consultants) proposed for the contract.
(d) Include CBD announcement number in Block NO. 2b of the SF 255. (e)
In Block No. 4 of the SF 255, insert only the number of personnel
proposed for potential project (not necessarily your total capacity).
Consultants as (A) and in-house personnel as (B). (f) In Block NO. 6 of
the SF 255, identify the discipline/ service to be supplied by each
consultant. (g) Provide brief resumes of the on-staff or consultant
employees you intend to use to perform the work in the anticipated
design time and the project assignment they will perform in Block No.
7 of your SF 255. Block No. 7 may be repeated as needed to identify all
the major discipline and key team members. Selection will be based on
the total team members presented in your SF 255, primarily block No. 7.
(h) In Block 10 your SF 255 include a draft design quality control
plan. It should include a brief presentation of the internal controls
and procedures that you use to insure that a quality design is
produced. Limit Block 10 of your submittal to no more than 10 pages.
(i) Solicitation packages are not provided for A-E contracts. This is
not a request for proposal (see Note No. 24). (0151) Loren Data Corp. http://www.ld.com (SYN# 0027 19950601\C-0008.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|