COMMERCE BUSINESS DAILY ISSUE OF JUNE 8,1995 PSA#1363Planning and Accounting Section, Planning Division, Facilities
Department, Shinshu University, 3-1-1 Asahi, Matsumoto-Shi, Nagano-Ken
390, Japan Y -- JAPAN: S16 CONSTRUCTION POC Tel 81/263/35-4600 X2216, 2217 FAX
NOT AVAILABLE. product data a industry sector code: B detailed product
description: Construction Title: phase-two Construction of the Shinshu
University hospital building; site: on the campus of Shinshu
University, 3-1-1 Asahi, Matsumoto-Shi, Nagano-Ken; summary: use of
building: hospital Facilities for hospital beds, pathological anatomy,
radiation therapy, etc.; Structure and number of stories: steel-framed
reinforced concrete Construction, nine stories above ground, one story
below ground; size: building area, 1,983 square meters; total floor
area, 13,610 square meters; site area, 316,337 square meters;
Construction period: approx. 21 months (620 days); main materials to be
used: concrete, 10,200 cubic meters; steel frame, 1,170 tons;
reinforcing steel, 1,240 tons; sheet glass, 1,630 square meters. C
product specifications/technical data: not available. D quantity: not
available. E U.S. dollar value: not available. F other information: to
be carried out as a model project for multi-layered glass, based on
the Japan-US agreement on flat glass sector on jan. 25, 1995. Response
data a response language: Japanese. B best way to respond: letter. C
from manufacturers only: not available. D information desired from U.S.
firm: not available. E primary buying factor: the lowest bid within the
estimated price range. F other information: pre-screening is required
to be eligible for bidding. Pre-screening deadline: June 12, 1995. Bid
documents must be obtained directly from the procuring agency, not
from U.S. Embassy. Payment in yen. A issuing agency: Shinshu University
B financing agency: same as above. C price of bid documents: not
available. D purchase bid documents by: July 5, 1995. E Tender number
required in all communications: not available. F performance bonds
required: not required. G closed procurement procedure: no. H bidding
procedures: open competitive Tender. I bid deadline: 14:00 pm, July 14,
1995. J other information: ''kensetsu kogyo shimbun'': 6/1/95. Eligible
Tender participants must be: 1) firms that do not fall under articles
70 and 71 of the cabinet order concerning budget, auditing, and
Accounting; 2) firms pre- qualified for open competitive bidding on
building work by the Ministry of education, science, and culture and
having scored at least 1, 500 points in a formula for open competitive
bidder's qualification; 3) firms that have, since 1990, constructed a
hospital facility made of steel- framed reinforced concrete
Construction and of at least six stories above ground and 7,000 square
meters in total floor area. Note: only Construction projects in which
bidders have had a 20 percent or greater share are eligible for
consideration; 4) firms that can assign to the Construction site a
full-time chief engineer or engineering supervisor who meets the
following criteria: a) is qualified as a certified First-class building
supervisor or architect; B) has, since 1990, had experience with
Construction of a project as described in item (3) above; and C) in the
case of engineering supervisor, is qualified to supervise designated
Construction work; 5) firms not currently suspended from designation by
the official in charge of outlays of this University; and 6) firms not
related by capital or personnel to the contractors involved in this
project. Post remarks Post contact/prepared by haomori approved by
gtaevs Please send a copy of your response to: Commercial Officer (FCS
TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to
TC407. Please note: All correspondence with the Awarding Authority
and/or the Procuring Agency MUST be in Japanese.. (0157) Loren Data Corp. http://www.ld.com (SYN# 0125 19950607\Y-0008.SOL)
Y - Construction of Structures and Facilities Index Page
|
|