COMMERCE BUSINESS DAILY ISSUE OF JUNE 8,1995 PSA#1363Contract Division, General Affairs Department, Kanto, Regional
Construction Bureau, Ministry of Construction, 1-3-1 Otemachi,
Chiyoda-Ku, Tokyo 100, Japan Y -- JAPAN: S16 CONSTRUCTION POC Tel 81/3/3211-6261 FAX NOT AVAILABLE.
product data a industry sector code: B detailed product description:
Construction Title: phase-two Construction of superstructure of the
First obitsugawa bridge; site: from nakajima to mangoku, kisarazu-Shi,
chiba-Ken; summary: five-span continuous, prestressed concrete box
girder bridge: one set, 380.4 meters, span length of 56.800 + 88.000 +
88.000 + 88.000 + 57.175 meters; Construction period: approx. 13
months (390 days); main materials to be used: concrete, approx. 4,600
cubic meters; reinforcing steel, approx. 540 tons; prestressing steel,
approx. 220 tons. C product specifications/technical data: not
available. D quantity: not available. E U.S. dollar value: not
available. F other information: not available. Response data a response
language: Japanese. B best way to respond: letter. C from manufacturers
only: not available. D information desired from U.S. firm: not
available. E primary buying factor: the lowest bid within the estimated
price range. F other information: pre-screening is required to be
eligible for bidding. Pre-screening deadline: 17:30 pm, June 12, 1995.
Bid documents must be obtained directly from the procuring agency, not
from U.S. Embassy. Payment in yen. A issuing agency: Kanto Regional
Construction Bureau, Ministry of Construction B financing agency: same
as above. C price of bid documents: not available. D purchase bid
documents by: 16:30 pm, July 13, 1995. E Tender number required in all
communications: not available. F performance bonds required: not
required. G closed procurement procedure: no. H bidding procedures:
open competitive Tender. I bid deadline: 10:00 am, July 24, 1995. J
other information: ''kensetsu kogyo shimbun'': 6/2/95. Eligible Tender
participants must be: 1) firms that do not fall under articles 70 and
71 of the cabinet order concerning budget, auditing, and Accounting;
2) firms pre- qualified for open competitive bidding on prestressed
concreting work by the Kanto Regional Construction Bureau; 3) firms not
undergoing bankruptcy procedures; 4) firms that have -- since April 1,
1990 as the main contractor -- constructed a project that meets the
following (a) to (D) criteria: a) highway bridge (of at least tl-20) or
railway bridge; B) prestressed concrete bridge other than single- span
bridge; C) span length of at least 40 meters; and D) Construction by
using the overhanging on-site concreting method (the above criteria
should refer to the same project). Note: only Construction projects in
which bidders have had a 20 percent or greater share are eligible for
consideration; 5) firms that can assign to the Construction site a
full-time chief engineer or engineering supervisor who meets the
following criteria: a) is qualified as a certified First-class
Construction supervisor or equivalent or higher; B) has -- since April
1, 1985 as the main contractor -- had experience with Construction of
a project as described in item (4) above; and C) in the case of
engineering supervisor, is qualified to supervise designated
Construction work; 6) firms not currently suspended from designation by
the director of the Kanto Regional Construction Bureau; and 7) firms
not related by capital or personnel to the contractors involved in this
project. Post remarks Post contact/prepared by haomori approved by
gtaevs Please send a copy of your response to: Commercial Officer (FCS
TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to
TC412. Please note: All correspondence with the Awarding Authority
and/or the Procuring Agency MUST be in Japanese.. (0157) Loren Data Corp. http://www.ld.com (SYN# 0126 19950607\Y-0009.SOL)