Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 12,1995 PSA#1365

NORTHERN DIVISION NAVAL FACILITIES ENGINEERING COMMAND, 10 INDUSTRIAL HIGHWAY, MAIL STOP #82, LESTER, PA 19113-2090

Z -- REPAIR SWIM RIVER BRIDGE HB-4 AT THE NWS, EARLE, COLTS NECK, NJ. SOL N62472-94-B-0017 DUE 062795 POC Contact Point, SHEILA BROWN fax, (610)595-0646, Contracting Officer, AL RANDAZZO, (610)595-0626 This project includes the construction of a new five-span composite steel beam roadway bridge at the site of and adjacent to the existing roadway structure. The new steel beam superstructure will support a cast-in-place reinforced concrete composite deck slab. The bridge substructure will consist of 4 piers of precast prestressed concrete piles with a cast-in-place reinforced concrete pile cap and 2 cast-in-place reinforced concrete abutment units founded on prestressed concrete piles. Realignment of the bridge approaches will involve site clearing, earthwork, and construction of a bituminous concrete roadway pavement. Work will be staged to maintain vehicular traffic at the facility during construction. Also included is the removal of: the existing bridge, concrete superstructure, timber pile substructure units, and the bridge approach roadway pavements. Experience clauses will be part of this solicitation. Estimated cost range: $1,000,000 to $5,000,000. The SIC code is 1629 and the size standard is $17 Million. This proposed contract is being issued as unrestricted. If you would like a copy of the plans and specs, please write or fax your request in. (0159)

Loren Data Corp. http://www.ld.com (SYN# 0114 19950609\Z-0020.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page