COMMERCE BUSINESS DAILY ISSUE OF JUNE 14,1995 PSA#1367CH2M HILL, 411 East Wisconsin Avenue, Suite 1600, Milwaukee, Wisconsin
53202 F -- LANDFILL CAP SOL SC80 due 070795. POC Bobbie Hughes 414/272-1052,
ext. 543. Notice to Subcontractors for a Request for Proposal (RFP) for
the Douglas Road Landfill Superfund Site Landfill Cap Remedial Action.
A two-step bidding process will be used for selection of a
subcontractor to construct a multi-barrier cap over the Douglas Road
Landfill Site located in Mishawaka, Indiana. The Contractor is CH2M
HILL, Inc. and the project is funded by the U.S. EPA under CH2 HILL's
prime contract with the U.S. EPA, Contract No. 68-W8-0040. The project
consists of excavation of offsite contaminated soils and placement of
these soils within the boundaries of the landfill, backfilling of
excavation with clean fill and soils, constructions of a multi-barrier
cap over the site, construction of stormwater management facilities
consisting of a retention basin and outfall, replacement of site
fencing, grading and seeding the landfill cap; and implementing a
Subcontractor quality control and health and safety program on a listed
U.S. EPA CERCLA hazardous waste site. The construction cost is
estimated to range from $3,000,000 to $6,000,000. Step 1 of the
two-step bidding process will consist of the submission of a technical
proposal from intereted subcontractors in accordance with the RFP.
Pricing information is not to be submitted during Step 1. The RFP
package will include an additional description of the project and will
specify the factors for evaluation of the technical proposals. The RFP
package for Step 1 will be available on June 12, 1995. Requests for the
RFP package will be received by phone or mail until June 30, 1995.
Company experience, project approach, financial record, and health and
safety policies/record are factors that will be evaluated. Relevant
experience with soil placement over FMLs and GCLs is essential.
Technical proposals are due in the CH2M HILL office by 4:00 pm. CST on
July 7, 1995. Those companies submitting technical proposals
determined to be acceptable will be provided with a Step 2 bid package
consisting of terms and conditions with specifications and drawings;
will be invited to a pre-bid meeting at the site currently scheduled
for July 28, 1995; and will be requested to submit a sealed bid. Award
of the subcontract will be made to the responsible bidder submitting
the lowest, responsive bid. Construction is anticpated to start by
mid-September 1995. This solicitation does not commit CH2M HILL or the
U.S. EPA to pay for any costs incurred in the submissions of
proposals, nor does it commit CH2M HILL or the U.S. EPA to procure or
subcontract for any services. A bid security will be required in the
amount of 20% of the Step 2 bid amount, and must accompany each bid.
The following SBE and SDBE goals have been adopted for this
subcontract: 10% of construction work and/or construction supplies and
materials shall be performed and/or supplied by SBEs; 5% of
construction work and/or construction supplies and materials shall be
performed and/or supplied by SDBEs. (159) Loren Data Corp. http://www.ld.com (SYN# 0031 19950613\F-0001.SOL)
F - Natural Resources and Conservation Services Index Page
|
|