|
COMMERCE BUSINESS DAILY ISSUE OF june 20,1995 PSA#1371DA, Tulsa District, Corps of Engineers, POB 61, Tulsa, OK 74121-0061 Y -- MATERIAL DISPOSAL SITE NEWT GRAHAM LOCK & DAM 18 OKLAHOMA SOL
DACW56-95-B-0047 DUE 083195 POC Chief, Contracting Division,
918/669-7275. Construction consists of: Constructing an earth fill dike
about 1400 feet long with a maximum height of about 15 feet to contain
dredge material. Construct drainage structures of 36-inch corrugated
metal pipe, reinforced concrete, and protection stone. Estimated cost
range of the project is from $25,000. to $100,000. An advanced
non-refundable fee of $9.00 is required for each set of specifications.
Make check payable to F&A Officer, USAED, Tulsa and mail to the
attention of Contracting Division. (0167) Loren Data Corp. http://www.ld.com (SYN# 0162 19950619\Y-0020.SOL)
Y - Construction of Structures and Facilities Index Page
|
|