|
COMMERCE BUSINESS DAILY ISSUE OF june 20,1995 PSA#1371USDA, Forest Service, East Zone Contracting, P.O. Box 130, Bozeman, MT
59771 Y -- BIRCH CREEK BRIDGES SOL R1-11-95-34 DUE 081195 POC Elaine
Hilliard, Gen'l. Info. (406) 587-6763 Work includes removing existing
native log bridges at Bridge Gulch and Armstrong Gulch. The structure
at Bridge Gulch will be replaced with a 23' span, 7' clear height
treated timber bridge; the structure at Armstrong Gulch will be
replaced with a 18'-0'' span, 8'-11'' rise structural plate bottomless
arch pipe with concrete footings. Also includes construction staking,
clearing, excavation, pit-run surfacing, and riprap. Beaverhead
National Forest, Dillon RD, Beaverhead County, MT. Package will be
available on or about 7/11/95. Contract time will be 288 calendar days.
Est. Start work 9/15/95. Price Range S50,000 to S100,000. (0167) Loren Data Corp. http://www.ld.com (SYN# 0165 19950619\Y-0023.SOL)
Y - Construction of Structures and Facilities Index Page
|
|