Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 29,1995 PSA#1378

USPFO for Washington, ATTN: Contracting Office, Bldg 32, Camp Murray, Tacoma, WA 98430-5170

Y -- REPAIR HEATING SYSTEM, BLDG 102, CAMP MURRAY, WASHINGTON AIR NATIONAL GUARD STATION, TACOMA, WA SOL DAHA45-95-B-0008 POC Joanie Dobesh, Contracting Office, 206/512-8311; Captain Robert McGaughey, Project Officer, 206/512-8566 Furnish all plant, labor, equipment, materials, tools and other items required to repair heating system, Bldg 102. Principle features include but are not limited to: removal of existing heating and ventilation systems including all piping, equipment, supporting utilities in portion of existing building; selective demolition as required for access to the work; installation of new gas-fired forced air heating system including all related ducting, controls, supports and associated appurturances; patching and repair of existing interior finishes as required; patching of and new flashings at existing metal roofing surfaces. ECC is between $100,000 and $500,000. Time of completion is 120 calendar days from the receipt of the Notice to Proceed. Solicitations will be available on or about 11 July 1995 on a first come, first serve basis by written or faxed requests. FAX number, 206-512-8933. The proposed construction is a 100 percent set-aside for small disadvantaged business concerns (SDB). See Note 4. (0178)

Loren Data Corp. http://www.ld.com (SYN# 0146 19950628\Y-0009.SOL)


Y - Construction of Structures and Facilities Index Page