COMMERCE BUSINESS DAILY ISSUE OF JULY 3,1995 PSA#1380Accounting Division, General Affairs Department, Chugoku- Shikoku
Regional Agricultural Administration, Office, Ministry of Agriculture,
Forestry, and, Fisheries, 9-24 Tenjin-Cho, Okayama-Shi 700, Japan,
(From July 24, 1-4-1 Shimoishii, Okayama-Shi 700) Y -- JAPAN: S16 CONSTRUCTION POC Tel 81/86/224-4511 X226 (FROM JULY
24, 81/86/224-4511 X2243) FAX N/A. product data a industry sector code:
B detailed product description: construction Title: dredging and
disposal of bottom slurry at the tamano site in the kojima lake-area
farmland disaster-prevention project; site: in the kojima lake,
chikko-midorimachi-chisaki and kori-chisaki, Okayama-Shi; summary: work
at this time: dredging of bottom slurry of 70, 000 cubic meters in
original volume; transport of slurry by pipes of 400 to 150 millimeters
in diameter and 1,700 meters in length; machine de-watering work, one
set; reclamation work, one set; excess water disposal work, one set;
overall work (work at this time, first-phase work, and second-phase
work), dredging of bottom slurry of 1,330,000 cubic meters in original
volume; construction period: approx. 200 days (overall period, approx.
100 months); main materials to be used: high- density-slurry dredger,
one boat (with capability of at least 50 percent slurry); transport
pipes, 400 to 150 millimeters in diameter and 1,700 meters in length;
de- watering machines (16-cubic-meter class/batch), 3 sets. C product
specifications/technical data: N/a (not available). D quantity: N/A. e
U.S. dollar value: N/A. F other information: N/A. response data a
response language: Japanese. B best way to respond: letter. C From
manufacturers only: N/A. D information desired From U.S. firm: N/A. e
primary buying factor: the lowest bid within the estimated price range.
F other information: pre-screening is required to be eligible for
bidding. Pre-screening deadline: 16:30 pm, July 26, 1995. Bid documents
must be obtained directly From the procuring Agency, not From U.S.
Embassy. Payment in yen. A issuing Agency: Chugoku-Shikoku Regional
Agricultural Administration Office (Ministry of Agriculture, Forestry,
and Fisheries) B financing Agency: same as above. C price of bid
documents: N/A. D purchase bid documents by: 16:30 pm, aug. 30, 1995.
E Tender number required in all communications: N/A. F performance
bonds required: not required. G closed Procurement procedure: no. H
bidding procedures: open competitive Tender. I bid deadline: 13:30 pm,
sep. 4, 1995. J other information: ''kensetsu kogyo shimbun'':
6/26/95. Eligible Tender participants must be pre-qualified consortia
comprised of firms that meet the following criteria: 1) firms
pre-qualified for open competitive bidding by the Chugoku-Shikoku
Agricultural Administration Office; 2) firms that do not fall under
articles 70 and 71 of the cabinet order concerning budget, auditing,
and Accounting; 3) firms that score at least 1,500 points in civil
engineering work in a formula calculated From bidding company's
objective criteria at the time of application for qualification; 4)
firms that can assign to the construction site a full-time chief
engineer or engineering supervisor who meets the following criteria: a)
in the case of chief engineer, is qualified as a certified first-class
construction supervisor under the construction Business law, or is
qualified in the area of building or Agricultural civil engineering
under the engineers law; and B) in the case of engineering supervisor,
is qualified to supervise designated construction work; 5) firms that
have -- since 1990, as the main contractor -- actually completed
either one of the following projects: a) dredging by the suction or
rotary bucket method; and B) machine de-watering or solar drying of
high- water-content slurry. Note: only construction projects in which
bidders have had a 20 percenter or greater share of involvement are
eligible for consideration; or firms that have participated in
experimental bottom slurry dredging projects conducted From 1991 to
1994 by the Chugoku-Shikoku Agricultural Administration Office; 6)
firms not currently suspended From designation for the Director of the
Chugoku-Shikoku Regional Agricultural Administration Office; 7) firms
not related by capital or personnel to the contractors involved in
this project; 8) consortia that meet the following criteria: a) are
comprised of three firms and must have each at least 20 percent of
involvement; B) are capable of carrying out this project properly,
based on an adequate plan; C) in the case of consortium's
representative, can assign to the construction site a chief engineer or
engineering supervisor who meets both item (4) above and has had
experience with a project as described in item (5) above; D) in the
case of consortium's representative, has a score of at least 1,500
points in civil engineering work in a formula calculated From its
objective criteria at the time of application for qualification; and e)
have had experience with both projects as described in items (5)-(a)
and (B) above. Post remarks Post contact/prepared by haomori approved
by cdukelow Please send a copy of your response to: Commercial Officer
(FCS TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to
TC429. Please note: All correspondence with the Awarding Authority
and/or the Procuring Agency MUST be in Japanese.. (0180) Loren Data Corp. http://www.ld.com (SYN# 0110 19950630\Y-0001.SOL)