USDA Forest Service, Mt. Baker-Snoqualmie National Forest, 21905 64th Avenue W., Mountlake Terrace, WA 98043

Y -- BIG FOUR - PHASE II, DARRINGTON RANGER DISTRICT. Sol R6-5-95-11. Contact Point, Janet Hada, 206/744-3338. Work at Big Four includes construction of a new intersection and double lane paved road into the parking area, miscellaneous striping and curb repair, removal of culverts and installation of an 11'7'' x 2'10'' x 50' open bottom culvert with concrete footings. Work at Perry Creek includes construction of a paved parking lot and intersection, a composting restroom, a plaza area with kiosk, and tie-in construction of a loop trail from the new restroom to the existing trail ends. All timber associated with these sites will be decked and later sold by the Government. Highway and parking lot signing is also included. Specifications and drawings will be available on or about July 17, 1995. Estimated start work date is September 15, 1995. Contract time is 455 calendar days. SIC for this project is 1611. The Government's estimated price range is between $250,000 and $500,000. Bonding is required. (177)

Loren Data Corp. http://www.ld.com (SYN# 0229 19950703\Y-0034.SOL)


Y - Construction of Structures and Facilities Index Page