Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JULY 6,1995 PSA#1382

Westinghouse Electric Corporation, Bettis Atomic Power Laboratory, P.O. Box 79, 814 Pittsburgh-McKeesport Boulevard, West Mifflin, PA 15122-0079

Y -- CORROSION LABORATORY MEZZANINE EXPANSION Sol 73-KZ-761150. Contact Karen Zych, 412/476-7396. The proposed construction project for the Corrosion Laboratory Mezzanine Expansion consists of modifying existing building space for corrosion testing. The major work effort includes the demolition of existing walls, HVAC systems, and mechanical and electrical utility systems; installation of a room for the housing of a laser system; extension of existing mechanical utilities (compressed air, nitrogen, hydrogen, DI/DG water, cooling water, pressure relief piping); installation of a main electrical distribution panel and subpanels, conduit and wireway systems, convenience receptacles, and highbay lighting; assembly and installation of control cabinets, instrumentation, and switchgear to control nine autoclave systems with associated pumpingstand hardware; and the relocation of 10 existing autoclave systems which include electrical switchgear, instrumentation, valves, and high pressure tubing and an overall support structure. 1. All prospective bidder personnel should have U.S. Department of Energy (DOE) security clearances to attend the on-site pre-bid tour. Uncleared personnel will be escorted to tour areas where work will be performed, except those areas determined to be sensitive by Westinghouse. Attendance at such meetings is essential for proper understanding of unique ingress/egress procedure and complex site conditions. Also, all personnel who will be performin on-site work will require a DOE security clearance. It takes approximately three to five months to obtain a security clearance after an individual submits a completed and acceptable ``Questionnaire for Sensitive Position'' (QSP). In this regard, in order for your company to receive a copy of the RFQ package, completed QSPs must be submitted to Westinghouse within two weeks from the date of your request for a copy of the RFQ package. Westinghouse shall process clearances at no cost to the contractor; however, the effort to complete and submit QSPs is solely at the contractor's expense. 2. Prospective bidders must have bonding capability from sureties listed in the U.S. Treasury Circular 570 relative to contract performance or be able to provide irrevocable letters of credit from financial institutions that are Federally insured and have investment grade or higher rating from a recognized commercial rating service. 3. This is a small business set-aside action and all prospective bidders must certify they qualify as a small business. 4. Prospective bidders must agree to submit a current Foreign Ownership, Control or Influence Certification and all necessary supporting business and financial documentation, if requested by Westinghouse. Request for the RFQ along with the necessary documentation clearly showing your firm meets the above minimum prerequisites, must be in writing (telephone requests will not be honored), and your letter must be postmarked no later than fifteen calendar days after the date of this CBD publication. (181)

Loren Data Corp. http://www.ld.com (SYN# 0143 19950705\Y-0009.SOL)


Y - Construction of Structures and Facilities Index Page