Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JULY 7,1995 PSA#1383

U. S. Army Corps of Engineers, Omaha District, 215 North 17th Street, Omaha, NE 68102-4978

Y -- WASTEWATER TREATMENT PLANT UPGRADE, FORT MCCOY, WISCONSIN SOL DACA45-95-B-0091 DUE 082295 POC Contact Contracting Division at: (402)221-4266. The work will include the following: (Approx. quantities) The project includes the upgrade of the existing wastewater treatment facility which includes new process buildings and the abandonment of some existing process buildings. New processes include headworks building; grit removal; comminutor; influent flow measurement; generator; influent lift station; primary clarifiers; trickling filter recirculation pumps; final clarifiers; ultraviolet disinfection; effluent flow measurement; sludge freeze dry bed; sludge sand dry beds; ferric chloride chemical addition for phosphorus removal; and several service buildings which include office, laboratory, equipment repair, and garage. Reusable processes include two-140 foot diameter trickling filters; existing final clarifier basins will be converted to solid contacts basins; new anaerobic digester (with new mechanical equiopment); one anerobic digester will be converted to sludge storage; existing control building to be converted to mechanical/sludge building. Abaondoned processes include existing headworks; primary clarifiers; wet well; two-140 foot diameter trickling filters; chlorine contact basin; chlorine/dechlorination equipment and sludge sand drying beds. The estimated construction cost of this project is between $5,000,000 and $7,500,000. Contractor's Quality Control will be a requirement in this contract. The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 540 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bid sets will be available on/a July 20, 1995. Half-size plans and specifications will be furnished upon request. All requests for solicitation packages should be made in writing no later than 14 days prior to bid opening. After such time, packages will be furnished if supply is available. It has been determined that the number of sets be limited to 1 (one) per firm (additional copies will be the responsibility of the requestor). Please list street address (for parcel del service) and mailing address. SPECIAL NOTES: All responders are advised that this requirement may be cancelled or revised at any time during the solicitation, selection, selection evaluation, negotiation and/or final award structure and disposition of US Armed Forces. Small & Disadvantaged Businesses are encouraged to participate & will be used to maximum extent practicable as both prime & subcontractor. (0186)

Loren Data Corp. http://www.ld.com (SYN# 0132 19950706\Y-0004.SOL)


Y - Construction of Structures and Facilities Index Page