COMMERCE BUSINESS DAILY ISSUE OF JULY 7,1995 PSA#1383CSR Contracts, 1201 Minuteman St., Bldg 423, Room C-320, CSR 1130, P.O.
Box 4127, Patrick Air Force Base, FL 32925-0127 Z -- REPLACE HVAC/REFRIGERATION UNITS VARIOUS FACILITIES, REPLACE 6
INCH FUEL LINES AT ASCENSION ISLAND; REPLACE HVAC/REFRIGERATION UNITS
VARIOUS FACILITIES AT ANTIGUA ISLAND SOL CSR95610006 due 090595.
Contact Roslyn Bates, 407/494-2921. Prime CSR Contract F08650-94-C-0001
with United States Air Force at Patrick Air Force Base, Florida. Place
of Subcontract performance is Ascension Island, South Atlantic Ocean.
Description of work: Replace HVAC/Refrigeration Units Various
Facilities. Existing systems using R-12 or R-502 will be replaced with
new R-22 equipment and/or chilled water system. Work includes, but is
not limited to, removal and replacement of four 5-ton refrigeration
systems for the medium and low temperatures in the existing walk-in
coolers and freezers removal and replacement of two 25-ton HVAC systems
using R-12 refrigeration with chilled water systems at Telemetry
building; demolition/general repair one 15-ton HVAC at MILS building;
removal and new installation of electrical work associted with new and
existing refrigeration equipment. Description of work: Replace 6 inch
Fuel Lines. Work includes, but isnot limited to, replacing
approximately 3,900 linear feet of quad 6-inch welded steel fuel piping
and associated valving; replacement of 6-inch pipes will be done with
8-inch welded steel fuel pipes and associated valving; routing of
pipeline is above ground over uneven terrain; piping supported by
concrete piers, both retaining and anchor types; replacement of 15% of
existing piers which have deteriorated. Contractor shall be able to
return fuel transfer systemto operations within 72 hours for temporary
emergency fueling operations. Place of Subcontract performance is
Antigua Island, West Indies. Description of Work: Replace
HVAC/Refrigeration Units various facilities. Work includes, but is not
limited to, demolition of a mechanical shed; remove and replace
eightrefrigeration systems for the medium and low temperatures in
existing walk-in coolers and freezers, with the capacity ranging from
one to five tons per each system; removal and new installation of
electrical work associted with new and existing equipment. Estimated
value is between $1,000,000 and $5,000,000. (184) Loren Data Corp. http://www.ld.com (SYN# 0187 19950706\Z-0011.SOL)