COMMERCE BUSINESS DAILY ISSUE OF JULY 11,1995 PSA#1385Contract Section, Construction and Repair Division, Financial Bureau,
General Secretariat, Supreme Court, 4-2 Hayabusa-Cho, Chiyoda-Ku, Tokyo
102, Japan Y -- JAPAN: S16 CONSTRUCTION POC Tel 81/3/3264-8111 X3513 FAX N/A.
product data a industry sector code: B detailed product description:
Construction Title: Construction of the Osaka family Court building;
site: 4-6- 20 Otemae, Chuo-Ku, Osaka-Shi; summary: use of building:
Court building; structure and number of stories: steel- framed
reinforced concrete Construction, eight stories above ground, one story
below ground; size: total floor area, 14,073 square meters; site area,
5,000 square meters; Construction period: approx. 19 months or 570
days (overall period, approx. 29 months); main materials to be used:
concrete, approx. 11,000 cubic meters; steel frame, approx. 850 tons;
reinforcing steel, approx. 1,260 tons. C product
specifications/Technical data: N/a (not available). D quantity: N/A. e
U.S. dollar value: N/A. F other information: N/A. response data a
response language: Japanese. B best way to respond: letter. C from
manufacturers only: N/ A. D information desired from U.S. firm: N/A. e
primary buying factor: the lowest bid within the estimated price
range. F other information: pre-screening is required to be eligible
for bidding. Pre-screening deadline: 16:00 pm, July 17, 1995. Bid
documents must be obtained directly from the procuring agency, not from
U.S. Embassy. Payment in yen. A issuing agency: Supreme Court B
financing agency: same as above. C price of bid documents: N/A. D
purchase bid documents by: aug. 17, 1995. E tender number required in
all communications: N/A. F performance bonds required: not required. G
closed procurement procedure: no. H bidding procedures: open
competitive tender. I bid deadline: 13:30 pm, aug. 28, 1995. J other
information: '' kensetsu kogyo shimbun'': 7/5/95. Eligible tender
participants must be: 1) firms that Do not fall under articles 70 and
71 of the cabinet order concerning budget, auditing, and accounting; 2)
firms pre- qualified for open competitive bidding on building work by
the Supreme Court; 3) firms that score at least 1,500 points in
building work in a formula calculated from bidding company's objective
criteria at the time of application for qualification; 4) firms that
have -- since 1990, as the main contractor -- carried out a project
(excluding ongoing projects) of the following criteria: a) use of
building: Public building; B) structure and number of stories: steel-
framed reinforced concrete Construction, at least eight stories above
ground, and one story below ground; and C) size: at least 12,000 square
meters in total floor area. Note: only Construction projects in which
bidders have had a 30 percent or greater share are eligible for
consideration; 5) firms that can assign, to the Construction site, a
full-time chief Engineer or engineering supervisor who meets the
following criteria: a) is qualified as a certified First-class building
supervisor or architect; B) has, since 1990, had experience with a
project as described in item (4) above; and C) in the case of
engineering supervisor, is qualified to supervise designated
Construction work; and 6) firms not currently suspended from
designation by the Supreme Court. Post remarks Post Contact/prepared by
haomori approved by cdukelow Please send a copy of your response to:
Commercial Officer (FCS TOP), American Embassy, Tokyo, Unit 45004, APO
Ap 96337, Refer to TC449. Please note: All correspondence with the
Awarding Authority and/or the Procuring Agency MUST be in Japanese..
(0188) Loren Data Corp. http://www.ld.com (SYN# 0208 19950710\Y-0005.SOL)
Y - Construction of Structures and Facilities Index Page
|
|