|
COMMERCE BUSINESS DAILY ISSUE OF JULY 11,1995 PSA#1385Panama Canal Commission, Engineering & Construction Bureau, Engineering
Division, Unit 2300, APO, AA 34011-2300 Y -- FABRICATE AND INSTALL STOPLOG SYSTEM FOR THE PANAMA CANAL SOL
95-41 DUE 110795 POC Robert J. Hauser, Chief, Spec. & Est., (507)
272-7949, James J. Hannigan, Contracting Officer, (507) 272-7205 The
Panama Canal Commission, an agency of the United States Government, is
interested in negotiating a firm fixed-price construction contract to
furnish seven (7) new Stoplogs, a pick-up beam, four (4) stoplog
guides, twenty-four (24) stoplog guide bases, and appurtenances.
Maximum weight to be handled is 150 Tons (Stoplog No. 7 plus pick-up
beam), maximum dimensions are: 115 ft. width, 17 ft. depth, and 22 ft.
height (stoplog No. 1 plus pick-up beam). The stoplog guide bases and
stoplog guides shall be installed at the Panama Canal locks, Republic
of Panama. The stoplogs will be used at each locks at (Gatun, Pedro
Miguel and Miraflores) existing caisson seats to dewater the locks
chambers in lieu of using a caisson. Solicitation documents will be
available on or about August 1, 1995 at the Panama Canal Commission,
Engineering and Construction Bureau, Engineering Division, Unit 2300,
APO AA 34011-2300, Phone (507)-272-7949, Fax (507)-272-2750. Each
request must be accompanied by a company or bank check, made out to
Treasurer, Panama Canal Commission, for $50.00 U.S. for each set of
specifications and the associated drawings. The site visit has been
scheduled for September 18, 1995. Opening of proposals is scheduled for
November 7, 1995. Responsible sources meeting the following conditions
will be considered: AISC Quality Certification Program Class III
fabricators, with capability to plan and successfully fabricate,
handle, and deliver the new stoplogs, pick-up beam, stoplog guides and
install guide bases underwater in the locks with the least
interruption to canal operations. Interested parties shall submit price
proposal; type and size of installations; handling, welding and testing
equipment; machinery and fabrication equipment; experience in the
construction of stoplogs, bulkheads, dams, gates, valves or similar
hydraulic structures. Evaluation/Award criteria will be contained in
the solicitation. Award will be made to the responsible offeror whose
proposal is most advantageous to the Government, technical, price, and
other factors considered (Best Value). (0188) Loren Data Corp. http://www.ld.com (SYN# 0214 19950710\Y-0011.SOL)
Y - Construction of Structures and Facilities Index Page
|
|