|
COMMERCE BUSINESS DAILY ISSUE OF JULY 12,1995 PSA#1386Commander, Pacific Division, Naval Facilities Engineering Command,
Contracts Department, Bldg 258, Pearl Harbor, HI 96860-7300 (Code
0211) C -- ARCHITECT-ENGINEER SERVICES FOR AN INDEFINITE QUANTITY CONTRACT
FOR VARIOUS HOUSING PROJECTS IN THE PACIFIC DIVISION, NAVAL FACILITIES
ENGINEERING COMMAND AREA OF RESPONSIBILITY SOL N62742-95-R-0011 POC
Contact Mr. Clifford Sagara, Contract Specialist, (808) 474-6315
Services include, but are not limited to design and engineering
services for preparation of engineering studies, Comprehensive
Neighborhood of Excellence Plans, Site Engineering Investigation (SEI)
or final plans, specifications, and cost estimates for various housing
repair or improvement projects in the Pacific Division, Naval
Facilities Engineering Command, Area of Responsibility. Wholehouse
revitalization projects include renovation, improvements and repair
order to bring the family housing unit in conformance with the
neighborhood of excellence plan to ensure an interesting, attractive,
and liveable residential environment in accordance with MIL-HDBK-1035.
Work include, but are not limited to, landscaping, community planning,
neighborhood site improvements, interior building repairs,
identification and construction plans to eliminate hazardous waste,
renovations of kitchens and bathrooms, replacing all old electrical
wiring, and providing fire protection systems. If asbestos or hazardous
materials exist, the Architect-Engineer (A-E) contractor shall identify
them and provide for their disposal in the construction plans and
specifications in accordance with applicable rules and regulations
pertaining to such hazardous materials. The selected A-E may be
required to participate in a pre-fee meeting within seven days of
notification and provide a fee proposal within ten days of the meeting.
The contract will be of the Indefinite Quantity type where the work
will be required on an ''as-needed'' basis during the life of the
contract providing the Government and contractor agree on the amount.
Each project contract will be a firm fixed price A-E Contract. The
Government will determine the delivery order amount by using rates
negotiated and negotiate the effort required to perform the particular
project. The contract shall not exceed twelve months or $1,000,000.00
total fee, whichever comes first. The Government guarantees a minimum
amount of $25,000.00. The Government reserves the option to extend the
contract for an additional year. There will be no future synopsis in
the event the options included in the contract are exercised. Estimated
construction cost of project is from $10,000.00 to $10,000,000.00.
Estimated date of contract award is October 1995. Proposals may be
subject to an advisory audit performed by the Defense Contract Audit
Agency. The following selection evaluation criteria, in relative order
of importance, will be used in the evaluation of A-E firms: (1)
Professional qualifications of firm and staff proposed in designing
Navy family housing and/or Department of Defense family housing
renovations, repairs or improvements in order to conform to Military
Handbook 1035 and designing tropical environments similar to Hawaii and
Guam. (2) Specialized recent experience and technical competence of
firm or particular staff members in designing Navy family housing
and/or Department of Defense family housing renovations, repairs or
improvements in order to conform to Military Handbook 1035 and
designing in tropical environments similar to Hawaii and Guam. (3)
Capacity to accomplish the work in the required time. (4) Past
performance on contracts with Government agencies and private industry
in terms of cost control, quality of work, and compliance with
performance schedules. (5) Architect-Engineer firm's design quality
control practices/techniques. (6) Location in the general geographical
area of the project and knowledge of the locality of the project;
provided, that application of this criterion leaves an appropriate
number of qualified firms, given the nature and size of the project.
(7) The volume of work previously awarded to the firm by the Department
of Defense shall also be considered, with the object of effecting an
equitable distribution of Department of Defense A-E contracts among
qualified A-E firms and firms that have not had Department of Defense
contracts. (8) Use of Small or Small Disadvantaged or Women-owned Small
Business firms shall also be considered. This prospective contract is
a potential 100 percent set-aside for small business (SB) concerns. The
small business size standard classification is SIC 8712 ($2.5 million
in annual receipts). If adequate interest is not received from
qualified SB concerns, this solicitation will automatically be opened
to all firms regardless of size or concern without further notice.
Replies to this notice are, therefore, requested from all concerns as
well as SB concerns. Subcontracting Plan is required from large
business firm with proposed fee of over $500,000.00. Each firm's past
performance and performance rating(s) will be reviewed during the
evaluation process and can affect the selection outcome. All A-E firms
which meet the requirements described in this announcement are invited
to submit complete, updated Standard Forms 254, Architect Engineer and
Related Services Questionnaire, and 255, Architect-Engineer and
Related Services Questionnaire for Specific Project, to the office
shown above. A-E firms utilized by the prime A-E must also submit
completed Standard Forms 254 and 255. Only one copy of each form is
required. IN BLOCK 10 AND AN ADDENDUM THERETO, IF NECESSARY, STATE WHY
YOUR FIRM IS SPECIALLY QUALIFIED BASED ON EACH OF THE ABOVE SELECTION
EVALUATION CRITERIA. FOR SELECTION EVALUATION CRITERION ''(2)'',
PROVIDE THE FOLLOWING INFORMATION FOR ONLY THE STAFF PROPOSED FOR THIS
WORK USING THESE COLUMN HEADINGS: ''NAME'', ''RELATED PROJECTS WORKED
ON'', ''YEAR'', ''FIRM'', AND ''TECHNICAL ROLE''. Show the office
location where work will be done and describe the experience and
location of those that will do the work. Firms responding to this
announcement within 30 days from publication date will be considered.
Firms must submit forms to the Contracts Department by 2:00 p.m. HST,
on the closing date. Should the due date fall on a weekend or holiday,
Standard Forms 254 and 255 will be due the first workday thereafter.
This is not a request for a proposal. See Note 24. (0191) Loren Data Corp. http://www.ld.com (SYN# 0016 19950711\C-0005.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|