|
COMMERCE BUSINESS DAILY ISSUE OF JULY 12,1995 PSA#1386Officer in Charge NAVFAC Contracts, Navy Ships Parts Control Center,
Building 305, Code 08C, P.O. Box 2020, Mechanicsburg, PA 17055-0788 Y -- CONSTRUCT WATER METER AND BACK FLOW PREVENTER BUILDING, NAVY
SHIPS PARTS CONTROL CENTER, MECHANICSBURG, PA SOL N62472-94-B-6028. DUE
082395. POC For Plans and Specs: Daryl Small (717)790-2515, fax
(717)790-2529, Contracting Officer, J.M. Nihoff. The proposed contract
listed here is being considered for 100 percent set-aside for small
disadvantaged business (SDB) concerns. Interested SDB concerns that
meet this criteria who wish to be considered in acordance with Public
Law and Federal Acquisition Regulations should, as early as possible
but not later than 15 days of this notice, indicate interest in the
acquisition by providing to the Contracting Office evidence of
capability to perform (including references for similar work with
points of contact, telephone number and contract number), letter from
bonding company certifying maximum level of bonding for the proposed
project, affirmative statement requesting set-aside action and intent
to bid, and a positive statement of eligibility as a small socially and
economically disadvantaged business concern. Even if you have sent
evidence of SDB eligibility on a prior solicitation, you must submit
documentation that will become a part of this solicitation file. If
adequate interest is not received from SDB concerns, within fifteen
days of this notice, the solicitation will be issued as unrestricted
without further notice. Funds are not presently available for this
contract. The Government's obligation under this contract is contingent
upon the availability of appropriated funds from which payment for
contract purposes can be made. No legal liability on the part of the
Government for any payment may arise until funds are made available to
the Contracting Officer for this contract and until the Contractor
receives notice of such availability, to be confirmed in writing by the
Contracting Officer. The work includes the construction of a building
to house a water meter and three back flow preventers, the demolition
of a water meter pit, the demolition of a utility manhole, the
relocation of a water meter and a back flow preventer to the new
building, providing and installing two new back flow preventers and
incidental related work. Estimated price range: Between $100,000 and
$250,000. Number of days in contract: 180. Number of bid items; One
with a unit price schedule. Standard Industrial Classification: 1711
Plumbing, Heating and Air-Conditioning $7.0 Million. (188) Loren Data Corp. http://www.ld.com (SYN# 0189 19950711\Y-0014.SOL)
Y - Construction of Structures and Facilities Index Page
|
|